Edition 47 9-59
Material Handlers
9
Lifting Capacities
●
MH3024
(Grenoble Sourced)
Lift Capacities
All values are in lb, bucket cylinder and linkage installed, hydraulic cab riser, work tool: none, with counterweight (11,470 lb), heavy lift on.
Load point height
Load over front
Load over rear
Load over side
Load at maximum reach (sticknose/bucket pin)
Undercarriage
Boom
Stick
MH or Standard
VA
8'2"
Undercarriage configuration
10 ft
15 ft
20 ft
25 ft
ft
25 ft
MH – stabilizers up – solid tires
*8600
*8600
*8600
18.83
MH – stabilizers down – solid tires
*8600
*8600
*8600
Lower (std UC) – f. stabilizer & r. dozer up
*8600
*8600
*8600
Lower (std UC) – f. stabilizer & r. dozer down
*8600
*8600
*8600
Lower (std UC) – f. dozer & r. stabilizer up
*8600
*8600
*8600
Lower (std UC) – f. dozer & r. stabilizer down
*8600
*8600
*8600
Lower (std UC) – 2 sets stabilizersup
*8600
*8600
*8600
Lower (std UC) – 2 sets stabilizersdown
*8600
*8600
*8600
20 ft
MH – stabilizers up – solid tires
14,300 14,300 10,900
*7400
*7400
*7400
23.03
MH – stabilizers down – solid tires
*14,800 *14,800 *14,800
*7400
*7400
*7400
Lower (std UC) – f. stabilizer & r. dozer up
14,200 13,400 10,400
*7400
*7400
*7400
Lower (std UC) – f. stabilizer & r. dozer down
*14,800 *14,800 *14,800
*7400
*7400
*7400
Lower (std UC) – f. dozer & r. stabilizer up
14,600 13,000 10,400
*7400
*7400
*7400
Lower (std UC) – f. dozer & r. stabilizer down
*14,800 *14,800 *14,800
*7400
*7400
*7400
Lower (std UC) – 2 sets stabilizersup
14,500 13,300 10,500
*7400
*7400
*7400
Lower (std UC) – 2 sets stabilizersdown
*14,800 *14,800 *14,800
*7400
*7400
*7400
15 ft
MH – stabilizers up – solid tires
*18,900 *18,900 16,300 14,000 14,000 10,500
9800
9800
7400
*7000
*7000
*7000
25.56
MH – stabilizers down – solid tires
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*7000
*7000
*7000
Lower (std UC) – f. stabilizer & r. dozer up
*18,900 *18,900 15,700 13,800 13,000 10,100
9600
9100
7000
*7000
*7000
6700
Lower (std UC) – f. stabilizer & r. dozer down
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*7000
*7000
*7000
Lower (std UC) – f. dozer & r. stabilizer up
*18,900 *18,900 15,700 14,200 12,600 10,100
9900
8800
7000
*7000
*7000
6700
Lower (std UC) – f. dozer & r. stabilizer down
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*7000
*7000
*7000
Lower (std UC) – 2 sets stabilizersup
*18,900 *18,900 15,800 14,200 13,000 10,200
9900
9100
7100
*7000
*7000
6800
Lower (std UC) – 2 sets stabilizersdown
*18,900 *18,900 *18,900 *15,400 *15,400 *15,400 *10,700 *10,700 *10,700
*7000
*7000
*7000
10 ft
MH – stabilizers up – solid tires
20,600 20,600 15,000 13,500 13,500 10,000
9600
9600
7200
*6900
*6900
6400
26.87
MH – stabilizers down – solid tires
*22,700 *22,700 *22,700 *16,300 *16,300 *16,300 *13,000 *13,000 *13,000
*6900
*6900
*6900
Lower (std UC) – f. stabilizer & r. dozer up
20,500 19,000 14,400 13,300 12,500
9600
9400
9000
6900
*6900
*6900
6100
Lower (std UC) – f. stabilizer & r. dozer down
*22,700 *22,700 *22,700 *16,300 *16,300 14,800 *13,000 *13,000 10,600
*6900
*6900
*6900
Lower (std UC) – f. dozer & r. stabilizer up
21,100 18,400 14,400 13,700 12,100
9600
9800
8600
6900
*6900
*6900
6100
Lower (std UC) – f. dozer & r. stabilizer down
*22,700 *22,700 *22,700 *16,300 *16,300 15,200 *13,000 *13,000 10,800
*6900
*6900
*6900
Lower (std UC) – 2 sets stabilizersup
21,000 18,900 14,600 13,600 12,400
9700
9700
8900
6900
*6900
*6900
6200
Lower (std UC) – 2 sets stabilizersdown
*22,700 *22,700 *22,700 *16,300 *16,300 *16,300 *13,000 *13,000 12,900
*6900
*6900
*6900
5 ft
MH – stabilizers up – solid tires
19,400 19,400 13,900 12,900 12,900
9500
9400
9400
7000
*7100
*7100
6100
27.17
MH – stabilizers down – solid tires
*25,300 *25,300 *25,300 *17,800 *17,800 *17,800 *13,600 *13,600 *13,600
*7100
*7100
*7100
Lower (std UC) – f. stabilizer & r. dozer up
19,200 17,800 13,300 12,700 11,900
9100
9200
8700
6600
*7100
*7100
5900
Lower (std UC) – f. stabilizer & r. dozer down
*25,300 *25,300 21,700 *17,800 *17,800 14,200 *13,600 *13,600 10,300
*7100
*7100
*7100
Lower (std UC) – f. dozer & r. stabilizer up
19,900 17,200 13,300 13,100 11,500
9100
9500
8400
6600
*7100
*7100
5900
Lower (std UC) – f. dozer & r. stabilizer down
*25,300 *25,300 22,500 *17,800 *17,800 14,600 *13,600 *13,600 10,600
*7100
*7100
*7100
Lower (std UC) – 2 sets stabilizersup
19,700 17,700 13,500 13,000 11,900
9200
9500
8700
6700
*7100
*7100
5900
Lower (std UC) – 2 sets stabilizersdown
*25,300 *25,300 *25,300 *17,800 *17,800 17,600 *13,600 *13,600 12,600
*7100
*7100
*7100
0 ft
MH – stabilizers up – solid tires
18,800 18,800 13,400 12,500 12,500
9100
9200
9200
6800
*7700
*7700
6300
26.48
MH – stabilizers down – solid tires
*25,300 *25,300 *25,300 *18,400 *18,400 *18,400 *14,100 *14,100 *14,100
*7700
*7700
*7700
Lower (std UC) – f. stabilizer & r. dozer up
18,600 17,300 12,800 12,300 11,600
8700
9000
8500
6500
*7700
*7700
6000
Lower (std UC) – f. stabilizer & r. dozer down
*25,300 *25,300 21,100 *18,400 *18,400 13,800 *14,100 *14,100 10,100
*7700
*7700
*7700
Lower (std UC) – f. dozer & r. stabilizer up
19,300 16,700 12,800 12,700 11,200
8700
9300
8200
6500
*7700
7600
6000
Lower (std UC) – f. dozer & r. stabilizer down
*25,300 *25,300 21,900 *18,400 *18,400 14,200 *14,100 *14,100 10,400
*7700
*7700
*7700
Lower (std UC) – 2 sets stabilizersup
19,100 17,200 12,900 12,600 11,500
8800
9300
8500
6500
*7700
*7700
6100
Lower (std UC) – 2 sets stabilizersdown
*25,300 *25,300 *25,300 *18,400 *18,400 17,100 *14,100 *14,100 12,400
*7700
*7700
*7700
–5 ft
MH – stabilizers up – solid tires
*22,800 *22,800 *22,800 18,700 18,700 13,300 12,400 12,400
9000
*8900
*8900
6900
24.74
MH – stabilizers down – solid tires
*22,800 *22,800 *22,800 *23,000 *23,000 *23,000 *17,100 *17,100 *17,100
*8900
*8900
*8900
Lower (std UC) – f. stabilizer & r. dozer up
*22,800 *22,800 *22,800 18,500 17,200 12,700 12,200 11,400
8600
*8900
8700
6600
Lower (std UC) – f. stabilizer & r. dozer down
*22,800 *22,800 *22,800 *23,000 *23,000 21,000 *17,100 *17,100 13,700
*8900
*8900
*8900
Lower (std UC) – f. dozer & r. stabilizer up
*22,800 *22,800 *22,800 19,200 16,600 12,700 12,600 11,000
8600
*8900
8400
6600
Lower (std UC) – f. dozer & r. stabilizer down
*22,800 *22,800 *22,800 *23,000 *23,000 21,800 *17,100 *17,100 14,100
*8900
*8900
*8900
Lower (std UC) – 2 sets stabilizersup
*22,800 *22,800 *22,800 19,000 17,100 12,800 12,500 11,400
8700
*8900
8600
6600
Lower (std UC) – 2 sets stabilizersdown
*22,800 *22,800 *22,800 *23,000 *23,000 *23,000 *17,100 *17,100 17,000
*8900
*8900
*8900
–10 ft
MH – stabilizers up – solid tires
*18,300 *18,300 13,500 12,600 12,600
9200
MH – stabilizers down – solid tires
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
Lower (std UC) – f. stabilizer & r. dozer up
*18,300 17,400 12,900 12,400 11,600
8800
Lower (std UC) – f. stabilizer & r. dozer down
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
Lower (std UC) – f. dozer & r. stabilizer up
*18,300 16,800 12,900 12,800 11,200
8800
Lower (std UC) – f. dozer & r. stabilizer down
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
Lower (std UC) – 2 sets stabilizersup
*18,300 17,300 13,100 12,700 11,600
8900
Lower (std UC) – 2 sets stabilizersdown
*18,300 *18,300 *18,300 *13,000 *13,000 *13,000
*Limited by hydraulic rather than tipping load.
Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating
axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface and the Variable Boom Cylinder adjusted to the maximum length. For lifting capacity including bucket and/or
quick coupler, the respective weight has to be subtracted from above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance.
Always refer to the appropriate Operation and Maintenance Manual for specific product information.




