Material Handlers

9

Lifting Capacities

MH3024

(Grenoble Sourced)

Lift Capacities

All values are in lb, bucket cylinder and linkage installed, hydraulic cab riser, work tool: none, with counterweight (11,470 lb), heavy lift on.

Load point height

Load over front

Load over rear

Load over side

Load at maximum reach (sticknose/bucket pin)

Undercarriage

Boom

Stick

MH or Standard

VA

9'6"

Undercarriage configuration

10 ft

15 ft

20 ft

25 ft

ft

30 ft

MH – stabilizers up – solid tires

*9500

*9500

*9500

13.94

MH – stabilizers down – solid tires

*9500

*9500

*9500

Lower (std UC) – f. stabilizer & r. dozer up

*9500

*9500

*9500

Lower (std UC) – f. stabilizer & r. dozer down

*9500

*9500

*9500

Lower (std UC) – f. dozer & r. stabilizer up

*9500

*9500

*9500

Lower (std UC) – f. dozer & r. stabilizer down

*9500

*9500

*9500

Lower (std UC) – 2 sets stabilizersup

*9500

*9500

*9500

Lower (std UC) – 2 sets stabilizersdown

*9500

*9500

*9500

25 ft

MH – stabilizers up – solid tires

*9800

*9800

*9800

*7000

*7000

*7000

20.67

MH – stabilizers down – solid tires

*9800

*9800

*9800

*7000

*7000

*7000

Lower (std UC) – f. stabilizer & r. dozer up

*9800

*9800

*9800

*7000

*7000

*7000

Lower (std UC) – f. stabilizer & r. dozer down

*9800

*9800

*9800

*7000

*7000

*7000

Lower (std UC) – f. dozer & r. stabilizer up

*9800

*9800

*9800

*7000

*7000

*7000

Lower (std UC) – f. dozer & r. stabilizer down

*9800

*9800

*9800

*7000

*7000

*7000

Lower (std UC) – 2 sets stabilizersup

*9800

*9800

*9800

*7000

*7000

*7000

Lower (std UC) – 2 sets stabilizersdown

*9800

*9800

*9800

*7000

*7000

*7000

20 ft

MH – stabilizers up – solid tires

*13,800 *13,800 11,000

*6100

*6100

*6100

24.54

MH – stabilizers down – solid tires

*13,800 *13,800 *13,800

*6100

*6100

*6100

Lower (std UC) – f. stabilizer & r. dozer up

*13,800 13,500 10,600

*6100

*6100

*6100

Lower (std UC) – f. stabilizer & r. dozer down

*13,800 *13,800 *13,800

*6100

*6100

*6100

Lower (std UC) – f. dozer & r. stabilizer up

*13,800 13,100 10,600

*6100

*6100

*6100

Lower (std UC) – f. dozer & r. stabilizer down

*13,800 *13,800 *13,800

*6100

*6100

*6100

Lower (std UC) – 2 sets stabilizersup

*13,800 13,400 10,700

*6100

*6100

*6100

Lower (std UC) – 2 sets stabilizersdown

*13,800 *13,800 *13,800

*6100

*6100

*6100

15 ft

MH – stabilizers up – solid tires

*17,000 *17,000 16,500 14,100 14,100 10,600

9900

9900

7400

*5800

*5800

*5800

26.90

MH – stabilizers down – solid tires

*17,000 *17,000 *17,000 *14,800 *14,800 *14,800 *12,200 *12,200 *12,200

*5800

*5800

*5800

Lower (std UC) – f. stabilizer & r. dozer up

*17,000 *17,000 15,900 13,900 13,100 10,200

9700

9200

7100

*5800

*5800

*5800

Lower (std UC) – f. stabilizer & r. dozer down

*17,000 *17,000 *17,000 *14,800 *14,800 *14,800 *12,200 *12,200 10,800

*5800

*5800

*5800

Lower (std UC) – f. dozer & r. stabilizer up

*17,000 *17,000 15,900 14,400 12,700 10,200 10,000

8900

7100

*5800

*5800

*5800

Lower (std UC) – f. dozer & r. stabilizer down

*17,000 *17,000 *17,000 *14,800 *14,800 *14,800 *12,200 *12,200 11,100

*5800

*5800

*5800

Lower (std UC) – 2 sets stabilizersup

*17,000 *17,000 16,100 14,300 13,100 10,300 10,000

9200

7200

*5800

*5800

*5800

Lower (std UC) – 2 sets stabilizersdown

*17,000 *17,000 *17,000 *14,800 *14,800 *14,800 *12,200 *12,200 *12,200

*5800

*5800

*5800

10 ft

MH – stabilizers up – solid tires

20,800 20,800 15,200 13,500 13,500 10,100

9700

9700

7200

*5700

*5700

*5700

28.15

MH – stabilizers down – solid tires

*21,500 *21,500 *21,500 *15,800 *15,800 *15,800 *12,600 *12,600 *12,600

*5700

*5700

*5700

Lower (std UC) – f. stabilizer & r. dozer up

20,700 19,300 14,600 13,300 12,600

9700

9500

9000

6900

*5700

*5700

5600

Lower (std UC) – f. stabilizer & r. dozer down

*21,500 *21,500 *21,500 *15,800 *15,800 14,900 *12,600 *12,600 10,600

*5700

*5700

*5700

Lower (std UC) – f. dozer & r. stabilizer up

21,400 18,700 14,600 13,800 12,200

9700

9800

8700

6900

*5700

*5700

5600

Lower (std UC) – f. dozer & r. stabilizer down

*21,500 *21,500 *21,500 *15,800 *15,800 15,300 *12,600 *12,600 10,900

*5700

*5700

*5700

Lower (std UC) – 2 sets stabilizersup

21,200 19,200 14,800 13,700 12,500

9800

9700

8900

6900

*5700

*5700

5700

Lower (std UC) – 2 sets stabilizersdown

*21,500 *21,500 *21,500 *15,800 *15,800 *15,800 *12,600 *12,600 *12,600

*5700

*5700

*5700

5 ft

MH – stabilizers up – solid tires

19,500 19,500 14,000 12,900 12,900

9500

9400

9400

6900

*5900

*5900

5700

28.44

MH – stabilizers down – solid tires

*24,700 *24,700 *24,700 *17,200 *17,200 *17,200 *13,200 *13,200 *13,200

*5900

*5900

*5900

Lower (std UC) – f. stabilizer & r. dozer up

19,400 17,900 13,400 12,700 11,900

9100

9200

8700

6600

*5900

*5900

5400

Lower (std UC) – f. stabilizer & r. dozer down

*24,700 *24,700 21,900 *17,200 *17,200 14,300 *13,200 *13,200 10,300

*5900

*5900

*5900

Lower (std UC) – f. dozer & r. stabilizer up

20,000 17,300 13,400 13,100 11,500

9100

9500

8400

6600

*5900

*5900

5400

Lower (std UC) – f. dozer & r. stabilizer down

*24,700 *24,700 22,600 *17,200 *17,200 14,700 *13,200 *13,200 10,600

*5900

*5900

*5900

Lower (std UC) – 2 sets stabilizersup

19,900 17,900 13,600 13,000 11,900

9200

9400

8600

6700

*5900

*5900

5500

Lower (std UC) – 2 sets stabilizersdown

*24,700 *24,700 *24,700 *17,200 *17,200 *17,200 *13,200 *13,200 12,600

*5900

*5900

*5900

0 ft

MH – stabilizers up – solid tires

18,800 18,800 13,300 12,500 12,500

9100

9100

9100

6700

*6300

*6300

5800

27.79

MH – stabilizers down – solid tires

*25,400 *25,400 *25,400 *18,400 *18,400 *18,400 *14,000 *14,000 *14,000

*6300

*6300

*6300

Lower (std UC) – f. stabilizer & r. dozer up

18,600 17,200 12,700 12,200 11,500

8700

8900

8500

6400

*6300

*6300

5500

Lower (std UC) – f. stabilizer & r. dozer down

*25,400 *25,400 21,100 *18,400 *18,400 13,800 *14,000 *14,000 10,000

*6300

*6300

*6300

Lower (std UC) – f. dozer & r. stabilizer up

19,200 16,600 12,700 12,700 11,100

8700

9300

8100

6400

*6300

*6300

5500

Lower (std UC) – f. dozer & r. stabilizer down

*25,400 *25,400 21,800 *18,400 *18,400 14,200 *14,000 *14,000 10,300

*6300

*6300

*6300

Lower (std UC) – 2 sets stabilizersup

19,100 17,100 12,900 12,600 11,500

8800

9200

8400

6500

*6300

*6300

5600

Lower (std UC) – 2 sets stabilizersdown

*25,400 *25,400 *25,400 *18,400 *18,400 17,100 *14,000 *14,000 12,300

*6300

*6300

*6300

–5 ft

MH – stabilizers up – solid tires

*21,500 *21,500 *21,500 18,500 18,500 13,100 12,300 12,300

8900

9100

9100

6600

*7200

*7200

6300

26.15

MH – stabilizers down – solid tires

*21,500 *21,500 *21,500 *23,700 *23,700 *23,700 *17,500 *17,500 *17,500 *12,800 *12,800 *12,800

*7200

*7200

*7200

Lower (std UC) – f. stabilizer & r. dozer up

*21,500 *21,500 *21,500 18,400 17,000 12,500 12,100 11,300

8500

8900

8400

6300

*7200

*7200

6000

Lower (std UC) – f. stabilizer & r. dozer down

*21,500 *21,500 *21,500 *23,700 *23,700 20,800 *17,500 *17,500 13,600 *12,800 *12,800 10,000

*7200

*7200

*7200

Lower (std UC) – f. dozer & r. stabilizer up

*21,500 *21,500 *21,500 19,000 16,400 12,500 12,500 10,900

8500

9200

8100

6300

*7200

*7200

6000

Lower (std UC) – f. dozer & r. stabilizer down

*21,500 *21,500 *21,500 *23,700 *23,700 21,600 *17,500 *17,500 14,000 *12,800 *12,800 10,200

*7200

*7200

*7200

Lower (std UC) – 2 sets stabilizersup

*21,500 *21,500 *21,500 18,900 16,900 12,700 12,400 11,300

8600

9100

8300

6400

*7200

*7200

6100

Lower (std UC) – 2 sets stabilizersdown

*21,500 *21,500 *21,500 *23,700 *23,700 *23,700 *17,500 *17,500 16,900 *12,800 *12,800 12,200

*7200

*7200

*7200

–10 ft

MH – stabilizers up – solid tires

18,700 18,700 13,300 12,400 12,400

9000

MH – stabilizers down – solid tires

*19,700 *19,700 *19,700 *14,400 *14,400 *14,400

Lower (std UC) – f. stabilizer & r. dozer up

18,500 17,100 12,700 12,100 11,400

8600

Lower (std UC) – f. stabilizer & r. dozer down

*19,700 *19,700 *19,700 *14,400 *14,400 13,700

Lower (std UC) – f. dozer & r. stabilizer up

19,100 16,600 12,700 12,600 11,000

8600

Lower (std UC) – f. dozer & r. stabilizer down

*19,700 *19,700 *19,700 *14,400 *14,400 14,100

Lower (std UC) – 2 sets stabilizersup

19,000 17,100 12,800 12,500 11,300

8700

Lower (std UC) – 2 sets stabilizersdown

*19,700 *19,700 *19,700 *14,400 *14,400 *14,400

*Limited by hydraulic rather than tipping load.

Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating

axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface and the Variable Boom Cylinder adjusted to the maximum length. For lifting capacity including bucket and/or

quick coupler, the respective weight has to be subtracted from above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance.

Always refer to the appropriate Operation and Maintenance Manual for specific product information.