All values are in lb, bucket cylinder and linkage installed, hydraulic cab riser, work tool: none, with counterweight (11,470 lb), heavy lift on.
Load point height
Load over front
Load over rear
Load over side
Load at maximum reach (sticknose/bucket pin)
Undercarriage
Boom
Stick
MH or Standard
One-Piece
8'2"
Undercarriage configuration
10 ft
15 ft
20 ft
25 ft
ft
25 ft
MH – stabilizers up – solid tires
*8400
*8400
*8400
19.36
MH – stabilizers down – solid tires
*8400
*8400
*8400
Lower (std UC) – f. stabilizer & r. dozer up
*8400
*8400
*8400
Lower (std UC) – f. stabilizer & r. dozer down
*8400
*8400
*8400
Lower (std UC) – f. dozer & r. stabilizer up
*8400
*8400
*8400
Lower (std UC) – f. dozer & r. stabilizer down
*8400
*8400
*8400
Lower (std UC) – 2 sets stabilizersup
*8400
*8400
*8400
Lower (std UC) – 2 sets stabilizersdown
*8400
*8400
*8400
20 ft
MH – stabilizers up – solid tires
*14,100 *14,100 10,900
*7400
*7400
*7400
23.46
MH – stabilizers down – solid tires
*14,100 *14,100 *14,100
*7400
*7400
*7400
Lower (std UC) – f. stabilizer & r. dozer up
*14,100 13,300 10,400
*7400
*7400
*7400
Lower (std UC) – f. stabilizer & r. dozer down
*14,100 *14,100 *14,100
*7400
*7400
*7400
Lower (std UC) – f. dozer & r. stabilizer up
*14,100 12,900 10,400
*7400
*7400
*7400
Lower (std UC) – f. dozer & r. stabilizer down
*14,100 *14,100 *14,100
*7400
*7400
*7400
Lower (std UC) – 2 sets stabilizersup
*14,100 13,300 10,500
*7400
*7400
*7400
Lower (std UC) – 2 sets stabilizersdown
*14,100 *14,100 *14,100
*7400
*7400
*7400
15 ft
MH – stabilizers up – solid tires
13,900 13,900 10,500
9900
9900
7400
*7100
*7100
7000
25.92
MH – stabilizers down – solid tires
*15,100 *15,100 *15,100 *12,100 *12,100 *12,100
*7100
*7100
*7100
Lower (std UC) – f. stabilizer & r. dozer up
13,700 13,000 10,100
9600
9200
7100
*7100
*7100
6700
Lower (std UC) – f. stabilizer & r. dozer down
*15,100 *15,100 *15,100 *12,100 *12,100 10,800
*7100
*7100
*7100
Lower (std UC) – f. dozer & r. stabilizer up
14,200 12,600 10,100 10,000
8900
7100
*7100
*7100
6700
Lower (std UC) – f. dozer & r. stabilizer down
*15,100 *15,100 *15,100 *12,100 *12,100 11,000
*7100
*7100
*7100
Lower (std UC) – 2 sets stabilizersup
14,100 12,900 10,200
9900
9100
7200
*7100
*7100
6700
Lower (std UC) – 2 sets stabilizersdown
*15,100 *15,100 *15,100 *12,100 *12,100 *12,100
*7100
*7100
*7100
10 ft
MH – stabilizers up – solid tires
20,400 20,400 14,900 13,400 13,400 10,000
9700
9700
7200
*7100
*7100
6300
27.23
MH – stabilizers down – solid tires
*22,400 *22,400 *22,400 *16,700 *16,700 *16,700 *14,000 *14,000 *14,000
*7100
*7100
*7100
Lower (std UC) – f. stabilizer & r. dozer up
20,300 18,800 14,300 13,200 12,400
9600
9400
9000
6900
*7100
*7100
6000
Lower (std UC) – f. stabilizer & r. dozer down
*22,400 *22,400 *22,400 *16,700 *16,700 14,700 *14,000 *14,000 10,500
*7100
*7100
*7100
Lower (std UC) – f. dozer & r. stabilizer up
20,900 18,300 14,300 13,600 12,000
9600
9800
8700
6900
*7100
*7100
6000
Lower (std UC) – f. dozer & r. stabilizer down
*22,400 *22,400 *22,400 *16,700 *16,700 15,100 *14,000 *14,000 10,800
*7100
*7100
*7100
Lower (std UC) – 2 sets stabilizersup
20,800 18,800 14,500 13,500 12,400
9700
9700
8900
7000
*7100
*7100
6100
Lower (std UC) – 2 sets stabilizersdown
*22,400 *22,400 *22,400 *16,700 *16,700 *16,700 *14,000 *14,000 12,800
*7100
*7100
*7100
5 ft
MH – stabilizers up – solid tires
19,300 19,300 13,900 12,900 12,900
9500
9400
9400
7000
*7400
*7400
6100
27.53
MH – stabilizers down – solid tires
*25,400 *25,400 *25,400 *18,200 *18,200 *18,200 *14,500 *14,500 *14,500
*7400
*7400
*7400
Lower (std UC) – f. stabilizer & r. dozer up
19,100 17,800 13,300 12,600 11,900
9100
9200
8700
6700
*7400
*7400
5800
Lower (std UC) – f. stabilizer & r. dozer down
*25,400 *25,400 21,600 *18,200 *18,200 14,200 *14,500 *14,500 10,300
*7400
*7400
*7400
Lower (std UC) – f. dozer & r. stabilizer up
19,700 17,200 13,300 13,100 11,500
9100
9500
8400
6700
*7400
7300
5800
Lower (std UC) – f. dozer & r. stabilizer down
*25,400 *25,400 22,300 *18,200 *18,200 14,600 *14,500 *14,500 10,500
*7400
*7400
*7400
Lower (std UC) – 2 sets stabilizersup
19,600 17,700 13,500 13,000 11,900
9200
9500
8700
6800
*7400
*7400
5900
Lower (std UC) – 2 sets stabilizersdown
*25,400 *25,400 *25,400 *18,200 *18,200 17,400 *14,500 *14,500 12,500
*7400
*7400
*7400
0 ft
MH – stabilizers up – solid tires
18,800 18,800 13,500 12,500 12,500
9200
9200
9200
6800
*8100
*8100
6200
26.84
MH – stabilizers down – solid tires
*25,700 *25,700 *25,700 *18,700 *18,700 *18,700 *14,400 *14,400 *14,400
*8100
*8100
*8100
Lower (std UC) – f. stabilizer & r. dozer up
18,600 17,300 12,900 12,300 11,600
8800
9000
8600
6500
*8100
7800
5900
Lower (std UC) – f. stabilizer & r. dozer down
*25,700 *25,700 21,100 *18,700 *18,700 13,800 *14,400 *14,400 10,100
*8100
*8100
*8100
Lower (std UC) – f. dozer & r. stabilizer up
19,200 16,700 12,900 12,700 11,200
8800
9300
8200
6500
*8100
7500
5900
Lower (std UC) – f. dozer & r. stabilizer down
*25,700 *25,700 21,800 *18,700 *18,700 14,200 *14,400 *14,400 10,400
*8100
*8100
*8100
Lower (std UC) – 2 sets stabilizersup
19,100 17,200 13,000 12,600 11,500
8900
9300
8500
6600
*8100
7700
6000
Lower (std UC) – 2 sets stabilizersdown
*25,700 *25,700 *25,700 *18,700 *18,700 17,000 *14,400 *14,400 12,300
*8100
*8100
*8100
–5 ft
MH – stabilizers up – solid tires
*22,200 *22,200 *22,200 18,700 18,700 13,400 12,400 12,400
9100
9200
9200
6800
9200
9200
6800
25.13
MH – stabilizers down – solid tires
*22,200 *22,200 *22,200 *23,800 *23,800 *23,800 *17,700 *17,700 *17,700 *11,300 *11,300 *11,300
*9500
*9500
*9500
Lower (std UC) – f. stabilizer & r. dozer up
*22,200 *22,200 *22,200 18,500 17,200 12,800 12,200 11,500
8700
9000
8500
6500
8900
8500
6500
Lower (std UC) – f. stabilizer & r. dozer down
*22,200 *22,200 *22,200 *23,800 *23,800 21,000 *17,700 *17,700 13,700 *11,300 *11,300 10,100
*9500
*9500
*9500
Lower (std UC) – f. dozer & r. stabilizer up
*22,200 *22,200 *22,200 19,100 16,600 12,800 12,600 11,100
8700
9300
8200
6500
9300
8200
6500
Lower (std UC) – f. dozer & r. stabilizer down
*22,200 *22,200 *22,200 *23,800 *23,800 21,700 *17,700 *17,700 14,100 *11,300 *11,300 10,400
*9500
*9500
*9500
Lower (std UC) – 2 sets stabilizersup
*22,200 *22,200 *22,200 19,000 17,100 12,900 12,500 11,400
8800
9300
8500
6600
9200
8400
6500
Lower (std UC) – 2 sets stabilizersdown
*22,200 *22,200 *22,200 *23,800 *23,800 *23,800 *17,700 *17,700 16,900 *11,300 *11,300 *11,300
*9500
*9500
*9500
–10 ft
MH – stabilizers up – solid tires
*25,700 *25,700 25,100 18,900 18,900 13,600 12,500 12,500
9200
11,000 11,000
8200
22.15
MH – stabilizers down – solid tires
*25,700 *25,700 *25,700 *19,800 *19,800 *19,800 *14,500 *14,500 *14,500
*11,800 *11,800 *11,800
Lower (std UC) – f. stabilizer & r. dozer up
*25,700 *25,700 24,000 18,700 17,400 13,000 12,300 11,600
8800
10,800 10,200
7800
Lower (std UC) – f. stabilizer & r. dozer down
*25,700 *25,700 *25,700 *19,800 *19,800 *19,800 *14,500 *14,500 13,800
*11,800 *11,800 *11,800
Lower (std UC) – f. dozer & r. stabilizer up
*25,700 *25,700 24,000 19,300 16,800 13,000 12,700 11,200
8800
11,200
9800
7800
Lower (std UC) – f. dozer & r. stabilizer down
*25,700 *25,700 *25,700 *19,800 *19,800 *19,800 *14,500 *14,500 14,200
*11,800 *11,800 *11,800
Lower (std UC) – 2 sets stabilizersup
*25,700 *25,700 24,300 19,200 17,300 13,100 12,600 11,500
8900
11,100 10,200
7900
Lower (std UC) – 2 sets stabilizersdown
*25,700 *25,700 *25,700 *19,800 *19,800 *19,800 *14,500 *14,500 *14,500
*11,800 *11,800 *11,800
*Limited by hydraulic rather than tipping load.
Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating
axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface. For lifting capacity including bucket and/or quick coupler, the respective weight has to be subtracted from
above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance.
Always refer to the appropriate Operation and Maintenance Manual for specific product information.