Edition 47 9-51

Material Handlers

9

Lifting Capacities

MH3024

(Grenoble Sourced)

Lift Capacities

All values are in lb, bucket cylinder and linkage installed, hydraulic cab riser, work tool: none, with counterweight (11,470 lb), heavy lift on.

Load point height

Load over front

Load over rear

Load over side

Load at maximum reach (sticknose/bucket pin)

Undercarriage

Boom

Stick

MH or Standard

One-Piece

8'2"

Undercarriage configuration

10 ft

15 ft

20 ft

25 ft

ft

25 ft

MH – stabilizers up – solid tires

*8400

*8400

*8400

19.36

MH – stabilizers down – solid tires

*8400

*8400

*8400

Lower (std UC) – f. stabilizer & r. dozer up

*8400

*8400

*8400

Lower (std UC) – f. stabilizer & r. dozer down

*8400

*8400

*8400

Lower (std UC) – f. dozer & r. stabilizer up

*8400

*8400

*8400

Lower (std UC) – f. dozer & r. stabilizer down

*8400

*8400

*8400

Lower (std UC) – 2 sets stabilizersup

*8400

*8400

*8400

Lower (std UC) – 2 sets stabilizersdown

*8400

*8400

*8400

20 ft

MH – stabilizers up – solid tires

*14,100 *14,100 10,900

*7400

*7400

*7400

23.46

MH – stabilizers down – solid tires

*14,100 *14,100 *14,100

*7400

*7400

*7400

Lower (std UC) – f. stabilizer & r. dozer up

*14,100 13,300 10,400

*7400

*7400

*7400

Lower (std UC) – f. stabilizer & r. dozer down

*14,100 *14,100 *14,100

*7400

*7400

*7400

Lower (std UC) – f. dozer & r. stabilizer up

*14,100 12,900 10,400

*7400

*7400

*7400

Lower (std UC) – f. dozer & r. stabilizer down

*14,100 *14,100 *14,100

*7400

*7400

*7400

Lower (std UC) – 2 sets stabilizersup

*14,100 13,300 10,500

*7400

*7400

*7400

Lower (std UC) – 2 sets stabilizersdown

*14,100 *14,100 *14,100

*7400

*7400

*7400

15 ft

MH – stabilizers up – solid tires

13,900 13,900 10,500

9900

9900

7400

*7100

*7100

7000

25.92

MH – stabilizers down – solid tires

*15,100 *15,100 *15,100 *12,100 *12,100 *12,100

*7100

*7100

*7100

Lower (std UC) – f. stabilizer & r. dozer up

13,700 13,000 10,100

9600

9200

7100

*7100

*7100

6700

Lower (std UC) – f. stabilizer & r. dozer down

*15,100 *15,100 *15,100 *12,100 *12,100 10,800

*7100

*7100

*7100

Lower (std UC) – f. dozer & r. stabilizer up

14,200 12,600 10,100 10,000

8900

7100

*7100

*7100

6700

Lower (std UC) – f. dozer & r. stabilizer down

*15,100 *15,100 *15,100 *12,100 *12,100 11,000

*7100

*7100

*7100

Lower (std UC) – 2 sets stabilizersup

14,100 12,900 10,200

9900

9100

7200

*7100

*7100

6700

Lower (std UC) – 2 sets stabilizersdown

*15,100 *15,100 *15,100 *12,100 *12,100 *12,100

*7100

*7100

*7100

10 ft

MH – stabilizers up – solid tires

20,400 20,400 14,900 13,400 13,400 10,000

9700

9700

7200

*7100

*7100

6300

27.23

MH – stabilizers down – solid tires

*22,400 *22,400 *22,400 *16,700 *16,700 *16,700 *14,000 *14,000 *14,000

*7100

*7100

*7100

Lower (std UC) – f. stabilizer & r. dozer up

20,300 18,800 14,300 13,200 12,400

9600

9400

9000

6900

*7100

*7100

6000

Lower (std UC) – f. stabilizer & r. dozer down

*22,400 *22,400 *22,400 *16,700 *16,700 14,700 *14,000 *14,000 10,500

*7100

*7100

*7100

Lower (std UC) – f. dozer & r. stabilizer up

20,900 18,300 14,300 13,600 12,000

9600

9800

8700

6900

*7100

*7100

6000

Lower (std UC) – f. dozer & r. stabilizer down

*22,400 *22,400 *22,400 *16,700 *16,700 15,100 *14,000 *14,000 10,800

*7100

*7100

*7100

Lower (std UC) – 2 sets stabilizersup

20,800 18,800 14,500 13,500 12,400

9700

9700

8900

7000

*7100

*7100

6100

Lower (std UC) – 2 sets stabilizersdown

*22,400 *22,400 *22,400 *16,700 *16,700 *16,700 *14,000 *14,000 12,800

*7100

*7100

*7100

5 ft

MH – stabilizers up – solid tires

19,300 19,300 13,900 12,900 12,900

9500

9400

9400

7000

*7400

*7400

6100

27.53

MH – stabilizers down – solid tires

*25,400 *25,400 *25,400 *18,200 *18,200 *18,200 *14,500 *14,500 *14,500

*7400

*7400

*7400

Lower (std UC) – f. stabilizer & r. dozer up

19,100 17,800 13,300 12,600 11,900

9100

9200

8700

6700

*7400

*7400

5800

Lower (std UC) – f. stabilizer & r. dozer down

*25,400 *25,400 21,600 *18,200 *18,200 14,200 *14,500 *14,500 10,300

*7400

*7400

*7400

Lower (std UC) – f. dozer & r. stabilizer up

19,700 17,200 13,300 13,100 11,500

9100

9500

8400

6700

*7400

7300

5800

Lower (std UC) – f. dozer & r. stabilizer down

*25,400 *25,400 22,300 *18,200 *18,200 14,600 *14,500 *14,500 10,500

*7400

*7400

*7400

Lower (std UC) – 2 sets stabilizersup

19,600 17,700 13,500 13,000 11,900

9200

9500

8700

6800

*7400

*7400

5900

Lower (std UC) – 2 sets stabilizersdown

*25,400 *25,400 *25,400 *18,200 *18,200 17,400 *14,500 *14,500 12,500

*7400

*7400

*7400

0 ft

MH – stabilizers up – solid tires

18,800 18,800 13,500 12,500 12,500

9200

9200

9200

6800

*8100

*8100

6200

26.84

MH – stabilizers down – solid tires

*25,700 *25,700 *25,700 *18,700 *18,700 *18,700 *14,400 *14,400 *14,400

*8100

*8100

*8100

Lower (std UC) – f. stabilizer & r. dozer up

18,600 17,300 12,900 12,300 11,600

8800

9000

8600

6500

*8100

7800

5900

Lower (std UC) – f. stabilizer & r. dozer down

*25,700 *25,700 21,100 *18,700 *18,700 13,800 *14,400 *14,400 10,100

*8100

*8100

*8100

Lower (std UC) – f. dozer & r. stabilizer up

19,200 16,700 12,900 12,700 11,200

8800

9300

8200

6500

*8100

7500

5900

Lower (std UC) – f. dozer & r. stabilizer down

*25,700 *25,700 21,800 *18,700 *18,700 14,200 *14,400 *14,400 10,400

*8100

*8100

*8100

Lower (std UC) – 2 sets stabilizersup

19,100 17,200 13,000 12,600 11,500

8900

9300

8500

6600

*8100

7700

6000

Lower (std UC) – 2 sets stabilizersdown

*25,700 *25,700 *25,700 *18,700 *18,700 17,000 *14,400 *14,400 12,300

*8100

*8100

*8100

–5 ft

MH – stabilizers up – solid tires

*22,200 *22,200 *22,200 18,700 18,700 13,400 12,400 12,400

9100

9200

9200

6800

9200

9200

6800

25.13

MH – stabilizers down – solid tires

*22,200 *22,200 *22,200 *23,800 *23,800 *23,800 *17,700 *17,700 *17,700 *11,300 *11,300 *11,300

*9500

*9500

*9500

Lower (std UC) – f. stabilizer & r. dozer up

*22,200 *22,200 *22,200 18,500 17,200 12,800 12,200 11,500

8700

9000

8500

6500

8900

8500

6500

Lower (std UC) – f. stabilizer & r. dozer down

*22,200 *22,200 *22,200 *23,800 *23,800 21,000 *17,700 *17,700 13,700 *11,300 *11,300 10,100

*9500

*9500

*9500

Lower (std UC) – f. dozer & r. stabilizer up

*22,200 *22,200 *22,200 19,100 16,600 12,800 12,600 11,100

8700

9300

8200

6500

9300

8200

6500

Lower (std UC) – f. dozer & r. stabilizer down

*22,200 *22,200 *22,200 *23,800 *23,800 21,700 *17,700 *17,700 14,100 *11,300 *11,300 10,400

*9500

*9500

*9500

Lower (std UC) – 2 sets stabilizersup

*22,200 *22,200 *22,200 19,000 17,100 12,900 12,500 11,400

8800

9300

8500

6600

9200

8400

6500

Lower (std UC) – 2 sets stabilizersdown

*22,200 *22,200 *22,200 *23,800 *23,800 *23,800 *17,700 *17,700 16,900 *11,300 *11,300 *11,300

*9500

*9500

*9500

–10 ft

MH – stabilizers up – solid tires

*25,700 *25,700 25,100 18,900 18,900 13,600 12,500 12,500

9200

11,000 11,000

8200

22.15

MH – stabilizers down – solid tires

*25,700 *25,700 *25,700 *19,800 *19,800 *19,800 *14,500 *14,500 *14,500

*11,800 *11,800 *11,800

Lower (std UC) – f. stabilizer & r. dozer up

*25,700 *25,700 24,000 18,700 17,400 13,000 12,300 11,600

8800

10,800 10,200

7800

Lower (std UC) – f. stabilizer & r. dozer down

*25,700 *25,700 *25,700 *19,800 *19,800 *19,800 *14,500 *14,500 13,800

*11,800 *11,800 *11,800

Lower (std UC) – f. dozer & r. stabilizer up

*25,700 *25,700 24,000 19,300 16,800 13,000 12,700 11,200

8800

11,200

9800

7800

Lower (std UC) – f. dozer & r. stabilizer down

*25,700 *25,700 *25,700 *19,800 *19,800 *19,800 *14,500 *14,500 14,200

*11,800 *11,800 *11,800

Lower (std UC) – 2 sets stabilizersup

*25,700 *25,700 24,300 19,200 17,300 13,100 12,600 11,500

8900

11,100 10,200

7900

Lower (std UC) – 2 sets stabilizersdown

*25,700 *25,700 *25,700 *19,800 *19,800 *19,800 *14,500 *14,500 *14,500

*11,800 *11,800 *11,800

*Limited by hydraulic rather than tipping load.

Lift capacity ratings are based on ISO 10567:2007, they do not exceed 87% of hydraulic lifting capacity or 75% of tipping load. The load point is the center line of the bucket pivot mounting pin on the stick. The oscillating

axle must be locked. Lifting capacities are based on the machine standing on a firm uniform supporting surface. For lifting capacity including bucket and/or quick coupler, the respective weight has to be subtracted from

above values. The use of a work tool attachment point to handle/lift objects, could affect the machine lift performance.

Always refer to the appropriate Operation and Maintenance Manual for specific product information.