ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects - page 126

Technical information
FID status
TEN-E
PCI project
TRA-N-098
M9a Lendava - Kidričevo
Pipeline 72 km and Compressor station 80 MW non-FID
2016
TEN-E 2011
No
TRA-N-100
M10 Vodice - Rateče
Pipeline 79 km
non-FID
2017
TEN-E 2010, 2011
No
TRA-N-263
M9b Kidričevo - Vodice
Pipeline 115 km and Compressor station 60 MW non-FID
2018
TEN-E 2012
No
GENERAL INFORMATION
THIRD-PARTY ACCESS REGIME
Applied for Exemption ?
Not yet
Plinovodi projects cluster 6
Code
Name
Commissioning
Promoter
Plinovodi
Operator
Plinovodi
Considered TPA Regime
Negotiated
DESCRIPTION AND BENEFITS OF THE PROJECT
These projects aim at providing additional supply to the Slovenian gas market, but mainly represent a substantial transit capacity to the Slovenian transmission system from Hungary to Italy, establishing two new Interconnection Points:
- one at the Slovenian-Hungarian border (Lendava) with an entry capacity of 288 GWh/d, possibly increasing to 819 GWh/d and
- one at the Slovenian-Italian border (Tarvisio) with an exit capacity of 819 Gwh/d.
The implementation of the project depends on the existence of corresponding upstream (within Hungary) transmission capacity.
Considered Tariff Regime
Negotiated
Web Link
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
126
1...,116,117,118,119,120,121,122,123,124,125 127,128,129,130,131,132,133,134,135,136,...155