ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects - page 123

Technical information
FID status
TEN-E
PCI project
TRA-N-099
non-FID
2017
TEN-E 2011
Yes
TRA-N-262
M3/1b Ajdovščina - Kalce
Pipeline 24 km
non-FID
2017
TEN-E 2011
Yes
TRA-N-261
M3/1c Kalce - Vodice
Pipeline 47 km
non-FID
2017
TEN-E 2011
Yes
TRA-N-093
CS Ajdovščina (2nd phase)
Compressor station 20 MW
non-FID
2023
Not part of TEN-E
No
TRA-N-101
M8 Kalce - Jelšane
Pipeline 51 km
non-FID
2023
TEN-E 2012
Yes
GENERAL INFORMATION
THIRD-PARTY ACCESS REGIME
Negotiated with the exception of the CS Ajdovščina
Applied for Exemption ?
Not yet
Plinovodi
Plinovodi
Operator
M3/1a Gorizia/Šempeter - Ajdovščina
Pipeline 29 km
Commissioning
Plinovodi projects cluster 4
Considered TPA Regime
Promoter
Code
Name
DESCRIPTION AND BENEFITS OF THE PROJECT
These projects aim at providing the necessary capacity to the Slovenian transmission system for the transportation of gas delivered either from the planned Krk terminal in Croatia or through the planned IAP pipeline, to Slovenia and Italy.
The cross-border capacity at Šempeter/Gorizia would increase by 102 GWh/d or (with the addition of the 2nd phase C/S) by 340 GWh/d.
Their implementation depends on the implementation of either of the above upstream projects.
Negotiated with the exception of the CS Ajdovščina
Web Link
Considered Tariff Regime
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
123