Technical information
FID status
TEN-E
PCI project
TRA-F-110
MRS Šempeter - reconstruction
Border metering station
FID
2014
Not part of TEN-E
No
TRA-N-092
CS Ajdovščina (3rd unit)
Compressor station 5 MW
non-FID
2016
Not part of TEN-E
No
TRA-N-108
M3 reconstruction (Ajdovščina - Šempeter / Gorizia)
Pipeline 31 km
non-FID
2023
TEN-E 2010, 2013
No
GENERAL INFORMATION
THIRD-PARTY ACCESS REGIME
Regulated
Regulated
Applied for Exemption ?
No
DESCRIPTION AND BENEFITS OF THE PROJECT
These projects aim at increasing the cross-border capacity of the connection with Italy and adjusting the operating parametres to the ones of the Italian transmission system.
- The first phase comprises the FID project of the reconstruction of the Border metering station (for reverse flow), to be commissioned in 2014.
- The second phase comprises a non-FID project, the extension of the C/S at Ajdovščina for the increase of capacity of the existing pipeline to Italy, planned to be commissioned in 2016.
- The third phase comprises the non-FID project of the pipeline increasing the capacity of the existing M3 pipeline to Italy on the section from Ajdovščina to šempeter looping between Ajdovščina and Šempeter, planned to be commissioned in
2023.
Web Link
Considered Tariff Regime
Plinovodi
Plinovodi
Operator
Considered TPA Regime
Promoter
Code
Name
Commissioning
Plinovodi projects cluster 2
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
121