ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects - page 118

SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
In PCI list ?
100%
IGAs
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
% Exemption in exit direction
Diameter (range) (inches)
20"
% Exemption in entry direction
Last completed Phase :
Planned
Diameter (range) (mm)
DN 500
Exemption granted ?
No
Commissioning
2017 Q4
Expected Load Factor
Applied for Exemption ?
No
Construction
2016 Q3
Total Compressor Power (MW)
+7.50
Considered Tariff Regime
Regulated
FID
2015 Q2
Total Pipeline Length (km)
+41.00
Considered TPA Regime
Regulated
End of permitting phase
2016 Q3
# of Pipelines, nodes, CS
1
Promoter
FGSZ Natural Gas Transmission
Not part of TEN-E
Public Financing
Operator
FGSZ Natural Gas Transmission
Yes
Private Financing
TRA-N-325
Slovenian-Hungarian interconnector
Non-FID
Pipeline including CS
None
Multilateral Financing
Web Link
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
118
1...,108,109,110,111,112,113,114,115,116,117 119,120,121,122,123,124,125,126,127,128,...155
Powered by FlippingBook