SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
–
In PCI list ?
100%
IGAs
–
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
% Exemption in exit direction
–
Diameter (range) (inches)
% Exemption in entry direction
–
Last completed Phase :
Planned
Diameter (range) (mm)
Exemption granted ?
Not relevant
Commissioning
2017 Q2
Expected Load Factor
Applied for Exemption ?
No
Construction
2015 Q3
Total Compressor Power (MW)
+13.50
Considered Tariff Regime
Regulated
FID
2015 Q1
Total Pipeline Length (km)
Considered TPA Regime
Regulated
End of permitting phase
2015 Q2
# of Pipelines, nodes, CS
3
Promoter
FGSZ Ltd.
Not part of TEN-E
Public Financing
Operator
FGSZ Ltd.
Yes
Private Financing
TRA-N-286
Romanian-Hungarian reverse flow Hungarian section
Non-FID
Pipeline including CS
None
Multilateral Financing
Web Link
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |