SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
–
In PCI list ?
–
IGAs
–
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
% Exemption in exit direction
–
Diameter (range) (inches)
20"
% Exemption in entry direction
–
Last completed Phase :
Planned
Diameter (range) (mm)
DN 500
Exemption granted ?
No
Commissioning
2023
Expected Load Factor
Applied for Exemption ?
No
Construction
Total Compressor Power (MW)
Considered Tariff Regime
Regulated
FID
Total Pipeline Length (km)
+30.00
Considered TPA Regime
Regulated
End of permitting phase
# of Pipelines, nodes, CS
2
Promoter
Plinacro Ltd
Not part of TEN-E
Public Financing
Operator
Plinacro Ltd
No
Private Financing
TRA-N-303
Interconnection Croatia-Bosnia and Herzegovina (Licka Jesenica-Rakovica-Trzac-Bosanska
Krupa with branches to Bihać and Velika
Kladuša
)
Non-FID
Pipeline including CS
None
Multilateral Financing
Web Link
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
116