SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
–
In PCI list?
–
IGAs
–
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
TRA-N-224
Gaspipeline Zenica - Brod
Non-FID
Pipeline including CS
None
Multilateral Financing
Web Link
Promoter
BH Gas d.o.o.
Not part of TEN-E
Public Financing
Operator
BH Gas d.o.o.
No
Private Financing
Considered TPA Regime
Negotiated (e.g. Exemption)
End of permitting phase
# of Pipelines, nodes, CS
1
Applied for Exemption ?
No
Construction
Total Compressor Power (MW)
Considered Tariff Regime
Negotiated (e.g. Exemption)
FID
Total Pipeline Length (km)
+130.00
% Exemption in entry direction
–
Last completed Phase :
Planned
Diameter (range) (mm)
DN 500
Exemption granted ?
No
Commissioning
2023
Expected Load Factor
% Exemption in exit direction
–
Diameter (range) (inches)
20"
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |