SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
–
In PCI list?
100%
IGAs
–
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
TRA-N-188
Reverse flow at GR-BG border (Greek part)
FID
Pipeline including CS
None
Multilateral Financing
Web Link
wwwdesfa.gr
Promoter
DESFA S.A.
Not part of TEN-E
Public Financing
Operator
DESFA S.A.
Yes
Private Financing
Considered TPA Regime
Regulated
End of permitting phase
# of Pipelines, nodes, CS
1
Applied for Exemption ?
Not relevant
Construction
2013 Q3
Total Compressor Power (MW)
Considered Tariff Regime
Regulated
FID
2013 Q3
Total Pipeline Length (km)
% Exemption in entry direction
–
Last completed Phase :
Construction
Diameter (range) (mm)
Exemption granted ?
Not relevant
Commissioning
2014 Q2
Expected Load Factor
+0.80
% Exemption in exit direction
–
Diameter (range) (inches)
Print
ENTSOG TYNDP 2013-2013 - Annex A
* This date refers to the 1st phase of the project.
*
Southern Corridor GRIP 2014–2023 Annex B |
100