SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
–
In PCI list ?
–
IGAs
–
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
% Exemption in exit direction
–
Diameter (range) (inches)
40"
% Exemption in entry direction
–
Last completed Phase :
Planned
Diameter (range) (mm)
DN 1000
Exemption granted ?
Not relevant
Commissioning
2016
Expected Load Factor
Applied for Exemption ?
Not relevant
Construction
Total Compressor Power (MW)
Considered Tariff Regime
Not applicable
FID
Total Pipeline Length (km)
+205
Considered TPA Regime
Not applicable
End of permitting phase
# of Pipelines, nodes, CS
2
Promoter
Bulgartransgaz EAD
Project of Common Interest
Public Financing
Operator
Bulgartransgaz EAD
Yes
Private Financing
TRA-N-140
Interconnection Turkey-Bulgaria
Non-FID
Pipeline including CS
2
Multilateral Financing
Web Link
Print
SOUTHERN CORRIDOR GRIP 2014-2023 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |