ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects - page 86

SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
In PCI list ?
IGAs
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
% Exemption in exit direction
Diameter (range) (inches)
% Exemption in entry direction
Last completed Phase :
Planned
Diameter (range) (mm)
Exemption granted ?
Not relevant
Commissioning
2016
Expected Load Factor
Applied for Exemption ?
No
Construction
Total Compressor Power (MW)
+22.00
Considered Tariff Regime
Regulated
FID
Total Pipeline Length (km)
+167.00
Considered TPA Regime
Regulated
End of permitting phase
# of Pipelines, nodes, CS
1
Promoter
Transgaz
Not part of TEN-E
Public Financing
Operator
Transgaz
Yes
Private Financing
TRA-N-126
Reverse flow on the interconnector Romania - Hungary
Non-FID
Pipeline including CS
None
Multilateral Financing
Web Link
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
86