SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
–
In PCI list ?
–
IGAs
–
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
5
+308
Web Link
FID
End of permitting phase
+0.90
Applied for Exemption ?
Exemption granted ?
% Exemption in entry direction
2017
2019
Planned
–
DN 800 - 1000
Construction
Commissioning
No
No
Regulated
Regulated
Total Compressor Power (MW)
Expected Load Factor
Diameter (range) (mm)
# of Pipelines, nodes, CS
Total Pipeline Length (km)
32" - 40"
Diameter (range) (inches)
% Exemption in exit direction
–
Last completed Phase :
Considered TPA Regime
Considered Tariff Regime
Operator
Private Financing
Public Financing
Multilateral Financing
Not part of TEN-E
Yes
None
LNG main gas transit pipeline (Part of North-South Gas Corridor) Zlobin-Bosiljevo-Sisak-Kozarac-
Slobodnica
Plinacro Ltd
Plinacro Ltd
Pipeline including CS
TRA-N-075
Non-FID
Promoter
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
76