DESCRIPTION OF THE PROJECT
The pipeline will cross the territory along the Adriatic coast from Fieri in Albania via Montenegro to Split in Croatia and will be linked to the existing Croatian gas transmission system (main direction Bosiljevo – Split).
The Ionian-Adriatic
p
ipeline is considered a part of the Energy Community Gas Ring, which is the concept of gasification for the entire region, proposed by the WB Study and accepted by the Gas Fora of the Energy Community.
EXPECTED BENEFITS
Security of Supply, Market integration (Market Integration benefits for Croatia
and the region (Albania, Montenegro, Bosnia & Herzegovina and neighbouring countries), Reverse Flows, Diversification of sources, Diversification of routes, N-1 National, N-1 Regional (Balkan region ), Back-up for renewables.
COMMENTS ABOUT THE PROJECT FINANCING
Public financing
Private financing
Multilateral financing
Ionic-Adriatic Pipeline - IAP / BH
30.00
Ionic-Adriatic Pipeline (Croatia) Hub Bosnia & Herzegovina
Ionic-Adriatic Pipeline - IAP / Split - HR
75.00
Ionic-Adriatic Pipeline (Croatia) Hub Croatia
Ionic-Adriatic Pipeline - IAP / ME
15.00
Ionic-Adriatic Pipeline (Croatia) Hub Montenegro
Ionic-Adriatic Pipeline - IAP / AB
30.00
Ionic-Adriatic Pipeline (Croatia) Hub Albania
Trans-Adriatic Pipeline - TAP / Ionic-Adriatic Pipeline - IAP
150.00
Trans-Adriatic Pipeline (Greece) Ionic-Adriatic Pipeline (Croatia)
PROJECTED CAPACITY INCREASES
Interconnection
Capacity (GWh/d)
From Zone
To Zone
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |