ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex B: Infrastructure Projects - page 77

Modelled Direction
Public financing
Private financing
Multilateral financing
PROJECTED CAPACITY INCREASES
COMMENTS ABOUT THE PROJECT FINANCING
Interconnection
Capacity (GWh/d)
From Zone
To Zone
DESCRIPTION OF THE PROJECT
EXPECTED BENEFITS
Security of Supply, Market integration (Croatia, Hungary, Bosnia
&
Herzegovina, Serbia), Reverse Flows, Diversification of routes, N-1 National (for Croatia), Back-up for renewables
.
This main transit gas pipeline is the future strategic
gas transmission connector of great significance and is an integral part of the North – South European Corridor designated the North-South (Baltic – Adriatic) Gas Connection.
Its purpose is linking the Polish and Croatian LNG (Liquefied Natural Gas) solutions under the umbrella of the European Commission (EC). This project is foreseen under the Gas Forum administered by the Energy Community
Secretariat, and although in Croatia, is regionally significant. The main
transit gas pipeline Zlobin-Bosiljevo-Sisak-Kozarac-Slobodnica:
- is a continuation of the existing Hungarian – Croatian interconnection (gas pipeline Varosföld-Dravaszerdahely-Donji Miholjac-Slobodnica)
- will be connected to the future Ionian Adriatic Pipeline (IAP)
- will be connected to the future LNG installation in Omišalj.
The pipeline will be construted on the territory of Croatia from the gas node Zlobin via Bosiljevo, Sisak, the gas node Kozarac to Slobodnica. It will be the "backbone" of the Croatian gas system.
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
77
1...,67,68,69,70,71,72,73,74,75,76 78,79,80,81,82,83,84,85,86,87,...155
Powered by FlippingBook