TRA-N-066
Interconnection Croatia/Bosnia
&
Herzegovina (Slobodnica- Bosanski Brod-Zenica)
Non-FID
Pipeline including CS
2
Multilateral Financing
Web Link
Promoter
Plinacro Ltd
Not part of TEN-E
Public Financing
Operator
Plinacro Ltd
No
Private Financing
Considered TPA Regime
Regulated
End of permitting phase
# of Pipelines, nodes, CS
1
Applied for Exemption ?
No
Construction
2018
Total Compressor Power (MW)
Considered Tariff Regime
Regulated
FID
Total Pipeline Length (km)
+6.00
% Exemption in entry direction
–
Last completed Phase :
Planned
Diameter (range) (mm)
DN 700
Exemption granted ?
No
Commissioning
2019
Expected Load Factor
+0.90
% Exemption in exit direction
–
Diameter (range) (inches)
28"