SPONSORS
GENERAL INFORMATION
FINANCING
TEN-E Project ?
99%
In PCI list ?
–
IGAs
–
THIRD-PARTY ACCESS REGIME
SCHEDULE
TECHNICAL INFORMATION
% Exemption in exit direction
–
Diameter (range) (inches)
28"
% Exemption in entry direction
–
Last completed Phase :
Planned
Diameter (range) (mm)
DN 700
Exemption granted ?
No
Commissioning
2015
Expected Load Factor
Applied for Exemption ?
No
Construction
2015
Total Compressor Power (MW)
Considered Tariff Regime
Regulated
FID
2014
Total Pipeline Length (km)
+155
Considered TPA Regime
Regulated
End of permitting phase
2014
# of Pipelines, nodes, CS
2
Promoter
Bulgarian Ministry of Economy and Energy (MEE)
Not part of TEN-E
Public Financing
Operator
Bulgartransgaz EAD
Yes
Private Financing
TRA-N-137
Interconnection Bulgaria - Serbia
Non-FID
Pipeline including CS
3
Multilateral Financing
Web Link
Print
ENTSOG TYNDP 2013-2013 - Annex A
Southern Corridor GRIP 2014–2023 Annex B |
92