Simon Storage, Fluorobenzene Gantry / Tank 24

Instrument & Electrical Installation Tender Package

DOCUMENT REF: SI347001.INS

ISSUE: B DATE: 13.10.97

PAGE: 16 OF 23

3.3.2

Mounting of Equipment

(Cont.)

Tank 24 Area

Enraf Junction Box at top of tank.

Enraf Control Unit at bottom on tank.

Switchroom

Logic Control Panel.

3.3.3

Installation of Cables

Drawing SI347001 and cable schedule SI347100 detail the cables and pneumatic tubes to

be installed.

3.3.4

Installation of Earth Rods and Earth Bar

Earth rods are to be supplied and installed near the gantry area. An earth bar is to be

supplied and fitted at the gantry.

3.4

Testing and Documentation

The completed installation is to be tested as detailed previously. Test records for the

complete installations are to be provided.

3.5

Site Visit before Tender Submission

A site visit is required to ensure that the work associated with this project is fully

understood. The site visit is to be organised by contacting D. Ransome at P & I Design Ltd.