Table of Contents Table of Contents
Previous Page  57 / 227 Next Page
Information
Show Menu
Previous Page 57 / 227 Next Page
Page Background

Simon Storage, Fluorobenzene Gantry / Tank 24

Instrument & Electrical Installation Tender Package

DOCUMENT REF: SI347001.INS

ISSUE: B DATE: 13.10.97

PAGE: 20 OF 23

4.3.2

Materials

The material prices which the Contractor inserts in the Schedule of Rates shall be deemed

to include the following:-

All costs associated with delivery to the Contractor's site stores or compound.

Any demurrage charges or costs associated with returning packing cases, drums and the

like for materials supplied by the Contractor.

All necessary allowances for waste.

All necessary allowances for consumables.

All necessary fixing devices.

4.3.3

Testing

The man-hour rates shall include for all testing.

4.3.4

Schedule of Day work Rates

Variations shall be valued on a lump sum basis. Such lump sums shall be derived from the

Schedule of Rates below and the man-hour estimates for the variations which the Engineer

has agreed in writing and all of which shall be subject to the issue of a Variation Order.

Position

40 Hour Rate Time & ½ Rate

Double Time

Site Supervision

Working Foreman

Approved Electrician

Instrument Technician

Labourer

Percentage to be added to net cost of materials %

Site Establishment

Cost inclusive of site management, office facilities, £

messing, toilets and constructional equipment at a

weekly rate.