Page Background

BRAMHALL TERMINAL – BRM-SIS1 ANNUNCIATOR RELAY REPLACEMENT

PHILLIPS 66

16089RPT205B

PAGE 13

Installation Documentation

Scope of Work

Yes No

Drawing revisions

Construction Drawings

Yes No

Not applicable, no changes

Operation & Maintenance

Operational

Procedures

Yes No

Not applicable, no changes to procedures

Maintenance

Procedures

Yes No

Not applicable, no changes to procedures

Testing Documentation

Testing Plan

Yes No

Re test during proof test

FAT

Yes No

Not applicable, system installed on site. See

SAT

Documentation &

Hardware Verification

Yes No

Not applicable, non SIL rated.

ATEX Certification

Yes No

Not applicable, safe area

SAT

Yes No

Qsf2058 - Method Statement Instrument

Proof testing procedures

FSA Stage 3

Yes No Not required

Management of Functional Safety

Safety Instrumented

Systems Policy

Document

Yes No

Not applicable, policy unaffected

Safety Instrumented

System Procedures

Yes No

Not applicable, proof testing procedures

unchanged

Safety Instrumented

System Safety Plan

Yes No

Plan to update

Training

Yes No

Not applicable, no change to operation or testing

External

Considerations

Yes No

Not applicable, none identified