Table of Contents Table of Contents
Previous Page  2 / 122 Next Page
Information
Show Menu
Previous Page 2 / 122 Next Page
Page Background

2 |

Southern Corridor GRIP 2017–2026

Table of Content

FOREWORD 4 EXECUTIVE SUMMARY 5

1

INTRODUCTION 6

2

TSO AND THIRD PARTY SPONSORED PROJECTS 10 2.1 Comparative List of Projects in the Previous and current SC GRIP 11 2.2 Projects by Country 18 2.3 Projects involving more than two EU Countries or non EU Countries or Offshore Projects 32

3

DEMAND 34 3.1 Annual demand 36 3.2 Annual Demand Breakdown 38 3.3 Peak Demand 40 3.4 Annual and Peak Demand evolution 43 3.5 The impact of renewables on gas demand in the Southern Corridor countries 45

4

SUPPLY 50 4.1 National Production 51 4.2 Imports 53 4.3 Prices 55

5

ASSESSMENTS AND MARKET ANALYSIS 60 5.1 Interconnection Point capacities offered (technical capacity), booked and used 61 5.2 Conclusion on the existence of congestion of the Region’s Interconnecting Points. 81