GCA 2015/08: Entry/Exit Murfeld
General Information
Promoter
GAS CONNECT AUSTRIA
GmbH
Operator
Gas Connect Austria GmbH
Host Country
Austria
Status
Planned
Website
Publication Approval Status
Approved
Sponsors
TRA-N-361
Project
Pipeline including CS
Non-FID
Update Date
06/05/2016
Advanced
Description
The Project enables incremental capacity at the IP Murfeld in both directions (AT->SI, SI->AT). Moreover, physical RF capacity at the Entry Point
Murfeld is achieved.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Murfeld (AT) / Ceršak (SI)
Gas Connect Austria GmbH
2019
AT
SI
53.7 GWh/d
Comment: conversion from Nm³/h to kwh/h with a GCV of 11.19
Gas Connect Austria GmbH
2019
SI
AT
166.5 GWh/d
Comment: conversion from Nm³/h to kwh/h with a GCV of 11.19
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 4 of 620