GCA 2015/08: Entry/Exit Murfeld

General Information

Promoter

GAS CONNECT AUSTRIA

GmbH

Operator

Gas Connect Austria GmbH

Host Country

Austria

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

TRA-N-361

Project

Pipeline including CS

Non-FID

Update Date

06/05/2016

Advanced

Description

The Project enables incremental capacity at the IP Murfeld in both directions (AT->SI, SI->AT). Moreover, physical RF capacity at the Entry Point

Murfeld is achieved.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Murfeld (AT) / Ceršak (SI)

Gas Connect Austria GmbH

2019

AT

SI

53.7 GWh/d

Comment: conversion from Nm³/h to kwh/h with a GCV of 11.19

Gas Connect Austria GmbH

2019

SI

AT

166.5 GWh/d

Comment: conversion from Nm³/h to kwh/h with a GCV of 11.19

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM