Table of Contents Table of Contents
Previous Page  6-7 / 610 Next Page
Information
Show Menu
Previous Page 6-7 / 610 Next Page
Page Background

Benefits

Main Driver

Market Demand

Main Driver Explanation

Benefit Description

PCI Details

PCI Benefits

Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation

prior to the commissioning of the project, Project concerns investment in reverse flow capacity

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

Murfeld

The technical load factor of the pipeline is confidential and

must not be published in the TYNDP.

Total

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

FEED

Market Test

Permitting

10/2015

07/2017

Supply Contracts

FID

Construction

11/2019

Commissioning

2019

2019

NDP and PCI Information

Part of NDP

Yes (NDP 2016 - 2025)

NDP Number

GCA 2015/08

Currently PCI

Yes (6.26.4)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 5 of 620

Current TYNDP : TYNDP 2017 - Annex A

Southern Corridor GRIP 2017–2026 Annex B |

4