Bidirectional Austrian-Czech Interconnector (BACI, formerly LBL project)

General Information

Promoter

GAS CONNECT AUSTRIA

GmbH

Operator

Gas Connect Austria GmbH

Host Country

Austria

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

Pipeline on Austrian territory

GAS CONNECT AUSTRIA GmbH

100%

Pipeline on Czech territory

NET4GAS, s.r.o

100%

TRA-N-021

Project

Pipeline including CS

Non-FID

Update Date

06/05/2016

Advanced

Description

The Bidirectional Austrian Czech Interconnection (BACI) will be a new infrastructure directly connecting the Austrian and Czech market. It will be

connected to the existing Czech transmission system via CS Břeclav (NET4GAS s.r.o.) and to the Austrian transmission system via Baumgarten (GAS

CONNECT AUSTRIA GmbH). The project BACI will enable capacity transmission for the first time between these two EU member states and it will

facilitate better market integration between Austria and the Czech Republic. The project BACI will also increase the overall flexibility of the Czech,

Austrian and also Polish system by diversification of gas supply routes and by connecting UGSs in the Czech Republic and Austria.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Poštorná / Reintal

Gas Connect Austria GmbH

2020

AT

CZ

201.4 GWh/d

Comment: New bidirectional IP connceting the Czech and the Austrian Virtual Trading Point .

Maximum capacity will be between 750,000Nm³/h and 1,480,000Nm³/h; conversion from

Nm³/h to kwh/h with a GCV of 11.19.

Gas Connect Austria GmbH

2020

CZ

AT

201.4 GWh/d

Comment: New bidirectional IP connceting the Czech and the Austrian Virtual Trading Point .

Maximum capacity will be between 750,000Nm³/h and 1,480,000Nm³/h; conversion from

Nm³/h to kwh/h with a GCV of 11.19.