Construction of a Looping CS Provadia – Rupcha village
General Information
Promoter
Bulgartransgaz EAD
Operator
Bulgartransgaz EAD
Host Country
Bulgaria
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
Provadia - Rupcha
Bulgartrasngaz EAD
100%
Strandja-IP BG/TR
Bulgartrasngaz EAD
100%
TRA-N-594
Project
Pipeline including CS
Non-FID
Update Date
27/05/2016
Non-Advanced
Description
Modernisation of the existing network for transit transmission with the construction of 50 km looping with prevailing diameter Dn 1200 from
Provadia to the village of Rupcha, replacement of 20 km (2х10 km) 12 of existing gas pipelines with diameter of Dn 1000 from CS Strandja to the
border with Turkey and increase in the capacity of CS Strandja with 10 MW. The realization of the project will ensure new capacity of 6 bcm/y (192,5
GWh/d) to Turkey.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Strandzha (BG) / Malkoclar (TR)
Bulgartransgaz EAD
2022
BGg/BGT
TRe
192.5 GWh/d
Comment: a new looping