Expected Gas Sourcing
Caspian Region, LNG (GR)
Benefits
Main Driver
Others
PCI Details
PCI Benefits
Project changes the capability to transmit gas across the borders of the member states concerned by at least 10%, compared to the situation
prior to the commissioning of the project, Project aims at fulfilling the infrastructure standard (N-1) rule at regional level in accordance with
Article 6(3) of Regulation EU, Project concerns investment in reverse flow capacity, Project aims at supplying directly or indirectly at least two
Member States
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
Bulgarian territory
1.8 bcm/y maximum capacity
700
62
Serbian territory
1.8 bcm/y maximum capacity
700
108
Total
170
Schedule
Start Date
End Date
Pre-Feasibility
02/2011
Feasibility
12/2011
12/2012
FEED
Market Test
05/2017
Permitting
08/2016
Supply Contracts
04/2017
FID
12/2012
Construction
05/2017
12/2018
Commissioning
2018
2018
NDP and PCI Information
Part of NDP
Yes (2016-2025 Ten-year network
development plan of BTG)
NDP Number
Sectin 5.2 (5.2.3)
Currently PCI
Yes (6.10.)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 19 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
46