Compressor station 1 at the Croatian gas transmission system
General Information
Promoter
Plinacro Ltd
Operator
Plinacro Ltd
Host Country
Croatia
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
Plinacro
100%
TRA-F-334
Project
Pipeline including CS
FID
Update Date
25/05/2016
Advanced
Description
Construction of such facilities is necessary due to the opening of the gas market, as well as providing sufficient transmission capacities and natural
gas delivery pressure conditions and for development of the gas market in Croatia and the neighbouring countries. Compressor stations will
significantly increase efficiency of the Croatian gas transmission system. Compressor stations are integral part of the transmission system, integrated
in the system, primarily in a manner to increase the flexibility of managing the existing transmission capacities of the system, and to provide rational
increase of transmission capacities according to user needs, that is, the requirements of the market and to satisfy market conditions arising from the
application of new legal regulation.
Regulatory Decisions and
similar material conditions
Enabled Projects
Project Code Project Name
TRA-N-066 Interconnection Croatia -Bosnia and Herzegovina (Slobodnica- Bosanski Brod)
TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac
TRA-N-070 Interconnection Croatia/Serbia (Slobdnica-Sotin-Bačko Novo Selo)
TRA-F-86
Interconnection Croatia/Slovenia (Lučko - Zabok - Rogatec)
TRA-N-1058 LNG Evacuation Pipeline Kozarac-Slobodnica
TRA-N-90 LNG evacuation pipeline Omišalj - Zlobin (Croatia)
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 295 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
52