Compressor station 1 at the Croatian gas transmission system

General Information

Promoter

Plinacro Ltd

Operator

Plinacro Ltd

Host Country

Croatia

Status

Planned

Website

Project's URL

Publication Approval Status

Approved

Sponsors

Plinacro

100%

TRA-F-334

Project

Pipeline including CS

FID

Update Date

25/05/2016

Advanced

Description

Construction of such facilities is necessary due to the opening of the gas market, as well as providing sufficient transmission capacities and natural

gas delivery pressure conditions and for development of the gas market in Croatia and the neighbouring countries. Compressor stations will

significantly increase efficiency of the Croatian gas transmission system. Compressor stations are integral part of the transmission system, integrated

in the system, primarily in a manner to increase the flexibility of managing the existing transmission capacities of the system, and to provide rational

increase of transmission capacities according to user needs, that is, the requirements of the market and to satisfy market conditions arising from the

application of new legal regulation.

Regulatory Decisions and

similar material conditions

Enabled Projects

Project Code Project Name

TRA-N-066 Interconnection Croatia -Bosnia and Herzegovina (Slobodnica- Bosanski Brod)

TRA-N-075 LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac

TRA-N-070 Interconnection Croatia/Serbia (Slobdnica-Sotin-Bačko Novo Selo)

TRA-F-86

Interconnection Croatia/Slovenia (Lučko - Zabok - Rogatec)

TRA-N-1058 LNG Evacuation Pipeline Kozarac-Slobodnica

TRA-N-90 LNG evacuation pipeline Omišalj - Zlobin (Croatia)

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 295 of 620

Current TYNDP : TYNDP 2017 - Annex A

Southern Corridor GRIP 2017–2026 Annex B |