Interconnection Bulgaria - Serbia
General Information
Promoter
Ministry of Energy
Operator
IBS Future Operator
Host Country
Bulgaria
Status
Planned
Website
Project's URL
Publication Approval Status
Approved
Sponsors
Bulgarian section
Ministry of Energy of Bulgaria
100%
Serbian section
Serbijagas
100%
TRA-F-137
Project
Pipeline including CS
FID
Update Date
27/05/2016
Advanced
Description
IBS aims at connecting the national gas transmission networks of Bulgaria and Serbia. It will be implemented in 3 stages. 1st: a pipe will be built from
Novi Iskar to Kalotina, BG (62.2 km) and from Nis to Dimitrovgrad, SR (108 km), with capacity from BG to SRB - 1,0 bcm/year, and from SRB to BG -
0.15 bcm/year. 2nd: the capacity will be increased from BG to SRB to 2,4 bcm/year, and from SRB to BG to 0,95 bcm/year, and later to 1,5 bcm/year,
by construction of 2 CSs (20 MW each) and 2 new gas pipeline sections (from G Bogrov CS to N Iskar – 19 km and from V. Orašje to Nis – 161 km).
3rd: by construction of the looping VS Batulsi - G Bogrov CS (62 km) the capacity from BG to SRB will be increased to 3,2 bcm/year. In the direction
from SRB to BG the construction of the pipeline Batajnica - V Orašje (116 km) will ensure transmission of 2 bcm/ year, and the construction of CS
Batočina (20 MW) will increase the capacity from 2.0 bcm/year to up to 2.5 bcm/y.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Interconnector BG RS
IBS Future Operator
2018
BGn
RS
51.0 GWh/d
Comment: Opeartor to be defined
IBS Future Operator
2018
RS
BGn
51.0 GWh/d
Comment: Operator to be defined