Expected Gas Sourcing
Caspian Region, Russia, LNG (), Southern gas corridor gas sources; European gas hubs; Black sea shelf gas; Domestic production;
Benefits
Main Driver
Others
PCI Details
PCI Benefits
General Criteria Fulfilled
Yes
Specific Criteria Fulfilled
Competition, Market Integration, Security of Supply, Sustainability
Specific Criteria Fulfilled Comments
Pipelines and Compressor Stations
Pipeline Section
Pipeline Comment
Diameter (mm) Length (km) Compressor Power (MW)
CS Strandja – a new IP with Turkey.
Replacement of 20 km of gas pipelines (2x10km), DN 1000 in
the section CS Strandja – a new IP with Turkey.
1,000
20
Looping CS Provadia – Rupcha village
new looping and additional power to existing compressior
station
1,200
50
10
Total
70
10
Schedule
Start Date
End Date
Pre-Feasibility
Feasibility
FEED
Market Test
05/2017
Permitting
Supply Contracts
FID
Construction
06/2022
Commissioning
2022
2022
NDP and PCI Information
Part of NDP
Yes (2016-2025 Ten-year network
development plan of BTG)
NDP Number
Section 5.1. (5.1.1)
Currently PCI
Yes (6.25.4)
CBCA Decision
No
Market Survey
Not Relevant (no CBCA decision)
Third-Party Access Regime
Considered TPA Regime
Regulated
Considered Tariff Regime
Regulated
Applied for Exemption
No
Exemption Granted
No
Exemption in entry direction
0.00%
Exemption in exit direction
0.00%
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM