Article 2: Administration

Section 2.5. Application-Specific Review Procedures

2.5.10. Riparian Buffer Development Review

Morrisville, NC

June 23, 2017

Unified Development Ordinance

Page 2-53

development. It also authorizes submittal of an application for Building Permit for construction

of approved buildings and structures in the Floodplain Overlay (FO) district, construction of

approved site improvements, approved alteration or relocation of

watercourses, and other approved land disturbing activities in the

FO district.

b.

Expiration of Approval

A Floodplain Development Permit shall expire if an application

for a Building Permit (or Certificate of Compliance/Occupancy, if

a Building Permit is not required) for the approved development

is not submitted within two years after the date of the Construction

Plan Approval,

c.

As-Built Elevation Certificate

Before a Certificate of Compliance/Occupancy may be

approved for development subject to the Floodplain Development

Permit, the applicant shall submit a final, “as-built” elevation

certificate prepared by, or under the direct supervision of, a

professional land surveyor or engineer to the Town Engineer for

approval.

d.

Inspections

Town staff and agents may inspect sites undergoing development

authorized by a Floodplain Development Permit to determine

whether development activities conform to approved plans and

terms of the permit and comply with non-encroachment

requirements.

C.

Floodplain Development Permit Review Standards

An application for a Floodplain Development Permit shall be approved only

if the Town Engineer determines that the proposed development complies

with all applicable standards i

n Section 5.6, Floodplain Management.

(Ord. No. 2014-051, 11/10/2014)

2.5.10.

Riparian Buffer Development Review

See

Section 6.5, Riparian Buffer Development Review.

2.5.11.

Stormwater Management Permit

See

Section 7.2, Administration and Procedures.

2.5.12.

Sign Permit

A.

Applicability

General

The procedure and standards in this subsection apply to the review of applications for a Sign

Permit, which shall be required before the erection, installation, construction, alteration, or moving

of any sign unless exempted from this Ordinance signage regulations in accordance with subsection

2

below, or from the permit requirements in accordance with subsection

3

below.

Sign Permit

Town Council Review and

Decision

Scheduling and Notice of

Meeting

Staff Review and

Planning Director Decision

Application Submittal and

Acceptance

Pre-Application

Conference

Step is Applicable

Step is Not Applicable

Planning and Zoning

Board Review and

Recommendation

Figure 2.5.12.B