Interconnection Macedonia-Greece
General Information
Promoter
MER JSC Skopje
Operator
MER JSC Skopje
Host Country
former Yugoslav Republic of
Macedonia
Status
Planned
Website
Publication Approval Status
Approved
Sponsors
DESFA
100%
TRA-N-980
Project
Pipeline including CS
Non-FID
Update Date
25/05/2016
Non-Advanced
Description
Main gas pipeline section Stip-Hamzali-Stojakovo (border with Greece) Within this section the following objects and systems are included: - Line
part in length of 110 km with pipe diameter DN 700
µ Valve stations - Pig Launching-Receiving Station DN700, -System for automatic
operating with the technological process for natural gas transport (DCS/SCADA); -Line for connection with optic fibres; -Power supply system -
Cathodic protection system - Security Signaling System and fire signalization. working (operating) pressure p= 40 bars; maximum pressure
(projected)pmax = 54 bars minimum pressurepmin = 25 bars -Capacity 326.000 m3/h (76,4 GWh/day)
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Stojakovo village (MK) / Pontoiraklia (GR)
MER JSC Skopje
2021
GR
MK
1.0 GWh/d