Interconnection Macedonia-Greece

General Information

Promoter

MER JSC Skopje

Operator

MER JSC Skopje

Host Country

former Yugoslav Republic of

Macedonia

Status

Planned

Website

Publication Approval Status

Approved

Sponsors

DESFA

100%

TRA-N-980

Project

Pipeline including CS

Non-FID

Update Date

25/05/2016

Non-Advanced

Description

Main gas pipeline section Stip-Hamzali-Stojakovo (border with Greece) Within this section the following objects and systems are included: - Line

part in length of 110 km with pipe diameter DN 700

µ Valve stations - Pig Launching-Receiving Station DN700, -System for automatic

operating with the technological process for natural gas transport (DCS/SCADA); -Line for connection with optic fibres; -Power supply system -

Cathodic protection system - Security Signaling System and fire signalization. working (operating) pressure p= 40 bars; maximum pressure

(projected)pmax = 54 bars minimum pressurepmin = 25 bars -Capacity 326.000 m3/h (76,4 GWh/day)

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Stojakovo village (MK) / Pontoiraklia (GR)

MER JSC Skopje

2021

GR

MK

1.0 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 604 of 620

Current TYNDP : TYNDP 2017 - Annex A