24 |

ENTSOG – GRIP Central Eastern Europe 2014–2023

PCI – LNG

Non-PCI – LNG

PCI – Transmission

Non-PCI – Transmission

PCI – UGS

Non-PCI – UGS

13

26

88

88

7

37

Projects

Figure 2.1:

Breakdown of the projects in TYNDP 2015 per PCI status (as approved in 2013) and

per type of infrastructure

LNG Terminal – FID

LNG Terminal – Non-FID

UGS – FID

UGS – Non-FID

Transmission – FID

Transmission – Non-FID

2013

2015

7

32

29

151

25

15

10

35

14

27

49

145

6

9

%

1

5

%

1

6

%

6

8

%

1

7

%

1

5

%

Projects

Projects

Figure 2.2:

Comparison of project submission in TYNDP 2015 and TYNDP 2013 per type of

infrastructure and FID status. The outer circle represents absolute numbers;

the inner circle represents the share of each project type.

Table 2.1:

Breakdown of projects in TYNDP 2015 by FID status and PCI status

For each project, the commissioning year is related to the first capacity increment of

the project in the case where there is more than one increment. For projects where

the commissioning date is not available (N/A) in the Annex A, it means that the

promoter has not submitted a capacity increment or did not specify a year within the

time horizon. The first full year of operation used in the assessment is the first full

calendar year following the commissioning date.

The following figures provide a statistical overview of the projects (see Annex A

for project details) based on information such as the type of infrastructure or the

FID/PCI status.

BREAKDOWN OF PROJECTS IN TYNDP 2015

BY FID STATUS AND PCI STATUS

PCI

Non-PCI

TOTAL

FID

13

34

47

NON-FID

95

117

212

TOTAL

108

151

259

The number of projects submitted for inclusion in the TYNDP remains high showing

the need to expand market integration benefits to the whole of Europe.