Background Image
Table of Contents Table of Contents
Previous Page  25 / 232 Next Page
Information
Show Menu
Previous Page 25 / 232 Next Page
Page Background

Ten Year Network Development Plan 2015 |

25

0

20

15

10

5

25

30

Projects

FR

SI

IT

DE

PL

HR

ES

RO

GR

HU

UK

NL

AT

BG

PT

CZ

IE

SK

CY

DK

EE

FI

BE

LT

GE

LV

MT

AL

AZ

BA

LU

SE

CH

TR

TM

TRA

LNG

UGS

Figure 2.3:

Number of projects per country and type

EU Members before 2004

EU Members after 2004

Non-Members

%

3

55

42

Figure 2.4:

Overview of all projects by EU Membership

Provided

Confidential

%

31

69

Figure 2.5:

Overview of cost information

There may be a link between current LNG price and the decrease in the number of

LNG project submissions. The slight increase in the number of storage projects may

reflect the recent concerns about energy security of Europe.

The following chart provides a summary of projects based on their geographical

location and by type of infrastructure.

The content of promoters’ submissions in term of granularity differs strongly. Some

promoters have submitted individual facilities as separate projects (e. g. compressor

station and pipe as individual project submissions) whereas others have joined

together a number of schemes in one project (e. g. compressor station and pipe as

a combined project submission). Such lack of consistency influences the number

of projects submitted in each country.

Compared to their number and relative economic weight within the European Union,

projects from new Member States (13 countries joined since 2004) represent a very

significant share of the 259 submissions as shown in the graph above. This provides