Action
Status
300714/4
SIS Design and Engineering
Ongoing
Description
The Company should use the results of the HA and SIL assessment work (Action
300714/3) to;
1. Design new SIS as necessary in alignment with the SIF and SIL requirements
identified and documented from the HA and SIL assessment activities. New SIS should
conform to benchmark standard BS EN 61511 or equivalent.
2. Perform gap analysis of existing (legacy) systems against the SIF and SIL
requirements identified and documented from the HA and SIL assessment activities.
The analysis should be used to re-engineer the existing systems where necessary to
fulfil the SIS requirements and conform to BS EN 61511 or equivalent as far as is
reasonably practicable.
No.
Action
Status
300714/5
Installation, Commissioning and Verification
Ongoing
Description
The Company should use the design and engineering documentation (Action
300714/4) to complete the installation of new and modification (re-engineering) of
existing systems where necessary. All SIS should be verified through commissioning
and validation activities as appropriate. This should include identification and as-built
drawings.
No.
Action
Status
300714/6
Operation and Maintenance
Ongoing
Description
The Company should develop written operating, inspection and maintenance
procedures for the SIS on the Shoreham Terminal. Operating procedures should
include logging demands, resets and inhibits.
Proof testing procedures should be developed to reveal all undiagnosed dangerous
failures specific for each SIF, end-to-end, unauthorised modifications, labelling,
weathering, erosion, corrosion, security, diagnostics, pass/fail criteria, approvals,
defects and follow-up. Consideration should be given to the inspection of the
Drexelbrook and Rotork valve (‘XV162’) in alignment with the manufacturers
recommendations.
Training should be provided to personnel involved with SIS at the Shoreham Terminal
(BS EN 61511, clause 5.2.2).