5

REVIEW OF REVISED LIFECYCLE DOCUMENTATION

5.1 Layer of Protection Analysis

The LOPA has been reviewed and accepted by the HSE. The SIL 2 Overfill Protection System

within the LOPA was estimated with a PFD of 0.005.

5.2 Safety Requirement Specification

Although this FSA is a Stage 5, it was decided to fully review all documentation, not just that

required as part of the modification. This was decided upon as all documentation has been re-

issued for Local Fuel plc and is effectively new issues.

In order to ensure compliance to BS EN 61511 the SRS was reviewed as follows:

5.2.1

Do the Safety Instrumented Functions (SIF) derive from a HAZOP or LOPA study, if not where

are they derived from. BS EN Clause 8 & 9.

Section 2.1 of the SRS references the LOPA and the requirements for a SIL 2 SIS to be

installed on the gasoline tanks.

5.2.2

Has the Safety Integrity Level (SIL) for each SIF been allocated. BS EN Clause 9.

Section 4.6 of the SRS details the SIF requirements for Tanks 1, 2, 3 & 4, which prior to the

proposed Marine Gas Oil modification were all available for gasoline. As stated previously

the LOPA considered that only two of these tanks would be utilised.

ACTION 1:

5.2.3

Has the demand on the SIF been specified (demand or continuous). BS EN Clause 10.

Section 3 of the SRS confirms that the system is a low demand SIS with a demand on the SIF