Local Fuel plc - Shoreham Oil Terminal

Safety Instrument System Functional Safety Assessment Stage 5

P & I Design Ltd

DOCUMENT NO: LF364100_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 15.06.2015

Tel: + 44 (0)1642 617444

PAGE 18 OF 32

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

o

Section 4.6 details the individual tank activation point for all tanks with the

exception of tanks 11, 18, 18A, 21 & 22 were it states 95% (TBC).

Action 6:

The title of the SRS and other lifecycle documentation is confusing as it is specific

in stating Gasoline Import Safety Instrumented System yet the documents are

written for all tanks not just gasoline. The SRS also provides for future individual

tankside valves. This obviously derives from the previous owner with future plans to

provide individual tank isolation in addition to or opposed to common pipeline

isolation.

Action 7:

Section 4.6.12 – there is a typo error should be Tank 18 not Tank 11 as described in

the Service section.