Local Fuel plc - Shoreham Oil Terminal

Safety Instrument System Functional Safety Assessment Stage 5

P & I Design Ltd

DOCUMENT NO: LF364100_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 15.06.2015

Tel: + 44 (0)1642 617444

PAGE 17 OF 32

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

5.2.19 SRS Review

Sections 5.2.1 to 5.2.18 of this FSA review the SRS with respect to it providing the required

information to comply with the relevant clauses of BS EN 61511.

The following details are more general review of the SRS in respect to the requirements of the

functionality of the SIS.

Section 2.2 of the SRS details that activation of a high level in any of the four gasoline

tanks Tank 1, 2, 3 & 4 will close the common import valve XV162. Activation of any

of the remaining Tank high level sensors will provide an alarm. However, Section 4.6

of the SRS contradicts this is stating in the section “Safe State” that they also stop the

flow to all tanks.

Action 1 previously requires Local Fuel plc to consider if the Tanks to

be converted to Marine Gas Oil should operate on the gasoline import

valve. The conclusion to this will also have an impact in modifying the

SRS to reflect how the modified system is to operate.

Action 4:

Action 5: