Previous Page  3 / 56 Next Page
Information
Show Menu
Previous Page 3 / 56 Next Page
Page Background

Cover

The 11 m high graben tie-in struc-

ture at the Nchwaning mine

at Assmang’s Black Rock Mine

Operations (BRMO) in the Northern

Cape. The structure forms part of the

ongoing Black Rock Project (BRP)

in which WorleyParsons is deeply

involved, as our cover story on page

20 explains (photo: Charles Corbett

on behalf of Assmang).

Editor

Arthur Tassell

Advertising Manager

Bennie Venter

e-mail:

benniev@crown.co.za

Design & Layout

Darryl James

Circulation

Karen Smith

Publisher

Karen Grant

Deputy Publisher

Wilhelm du Plessis

Printed by:

Shumani Mills Communications

The views expressed in this publication

are not necessarily those of the editor or

the publisher.

Published monthly by:

Crown Publications cc

P O Box 140,

Bedfordview, 2008

Tel: (+27 11) 622-4770

Fax: (+27 11) 615-6108

e-mail:

mining@crown.co.za www.modernminingmagazine.co.za

Average circulation

(April–June 2016)

4306

MODERN

M I N I N G

CONTENTS

NOVEMBER 2016

8

20

24

ARTICLES

REGULARS

28

30

MINING NEWS 4 Gold Fields to spend US$1,4 billion at Damang 5 Galane identifies potential extension of Tau orebody 6 Metallon lifts its gold production by 18 % 8 Bulk sampling plant at Montepuez commissioned 10 Orca Gold announces Block 14 drilling results 11 Deep drilling at Syama delivers high-grade results 12 Phase 2A expansion of Asanko Gold Mine approved 13 Development starts at Magambazi 16 Balama on course for Q2 2017 commissioning 17 R533 million Shondoni mine contract completed 18 In-pit mining at Lerala temporarily suspended 19 Waterberg PFS envisages a multi-decline mechanised mine PRODUCT NEWS 44 SA company repairs condenser for DRC facility 44 Energy efficient solution for Yanfolila mill 45 SEW supplies gear units for coal terminal expansion 46 Improved belt tracking system uses ribbed lagging 47 FLSmidth commissions wedge wire machine 48 Multotec makes wear plate inspection easier 49 Core logging solution demonstrated in Cape Town 50 Oxford XRF analysers available from United Scientific 51 CDE Global establishes SA office COVER 20 Safety comes first on Black Rock Project GOLD 24 Randgold looking for three new mines over five years 28 CIL project could transform Ity into a flagship operation DIAMONDS 30 Cullinan’s C-Cut starts its ramp up FEATURE – CONSULTANTS/PROJECT HOUSES 34 Sound Mining weathers the storm 39 Bakubung to deliver its first ore by the end of 2017 42 SRK seminar highlights mining’s challenges and opportunities

November 2016

MODERN MINING

1