264 |
TAR NC Implementation Document – Second Edition September 2017
List of Figures
Figure 1 NC establishment process 15 Figure 2 Application of the TAR NC rules at different points on the transmission network 32 Figure 3 The TAR NC scope at different points of transmission networks 33 Figure 4 Application of the TAR NC rules at points with third countries 34 Figure 5 Definitions: revenue and tariffs 36 Figure 6 Definitions: cycle of transmission services revenue, tariffs and services 37 Figure 7 Definitions: reference prices and capacity-based transmission tariffs 39 Figure 8 TAR NC regulatory regimes 40 Figure 9 Different regulatory periods in ENTSOG’s Members 41 Figure 10 Different tariff periods for ENTSOG’s Members 41 Figure 11 Basis for performing cost allocation assessments 50 Figure 12 Link between revenue reconciliation, cost allocation, reference price determination and revenue recovery 55 Figure 13 Possible components of a RPM 56 Figure 14 Current adjustments applied by European TSOs 57 Figure 15 Principles for the choice of a RPM 60 Figure 16 Balance for CWD RPM 61 Figure 17 Simple example of airline distance calculation 63 Figure 18 Current entry-exit splits applied by European TSOs 65 Figure 19 Discounts at entry-points-from/exit-points-to storage facilities and infrastructure ending the isolation, and at entry-points-from LNG facilities 66 Figure 20 Multi-TSO arrangements in an entry-exit system within one MS and covering more than one MS 69 Figure 21 Separate reserve prices published in June 2018 for auctions in July 2018 75 Figure 22 Level of multipliers and seasonal factors 78