Table of Contents Table of Contents
Previous Page  100-101 / 1248 Next Page
Information
Show Menu
Previous Page 100-101 / 1248 Next Page
Page Background

Strandzha (BG) / Malkoclar (TR)

Comment: Transmission between Bulgaria and Turkey via existing transmission system at IP

Malkoclar, New capacity increment from 4Q 2025 to the level of 1140 GWh/d.

Bulgartransgaz EAD

2025

BGg/BGT

TRe

570.0 GWh/d

Capacity Increments Variant(s) For Information Only

Variant : Eastring - BG-3

Low capacity scenario (low in direction N->S), starting at Negru-Voda IP at RO-BG border,

passing through BG using upgraded existing pipelines to Malkoclar IP at BG-TR border

Point

Operator

Year

From Gas System To Gas System Capacity

Eastring BG Domestic Point

Bulgartransgaz EAD

2021

BGn

BG/EAR

200.0 GWh/d

Comment: Connection of Eastring at Negru-Voda IP, with domestic market, Entry/Exit capacity

at domestic points may go up to the level of 200GWh/d if sum of all Exit capacities from

domestic system to adjacent networks (or vice versa) is able to reach this level.

Bulgartransgaz EAD

2021

BG/EAR

BGn

200.0 GWh/d

Comment: Connection of Eastring at Negru-Voda IP, with domestic market, Entry/Exit capacity

at domestic points may go up to the level of 200 GWh/d if sum of all Exit capacities from

domestic system to adjacent networks (or vice versa) is able to reach this level.

Malkoclar (TR) > Strandzha (BG)

Bulgartransgaz EAD

2021

TRi

BGg/BGT

570.0 GWh/d

Comment: Transmission between Eastring - Bulgaria and Turkey via existing IP Malkoclar, New

capacity increment from 4Q 2025 to the level of 1140 GWh/d.

Bulgartransgaz EAD

2025

TRi

BGg/BGT

570.0 GWh/d

Negru Voda II, III (RO) / Kardam (BG)

Bulgartransgaz EAD

2021

BGg/BGT

RO/TBP

342.0 GWh/d

Comment: Transmission via existing IP Negru-Voda with increase of capacity at level of 342

GWh/d, New capacity increment from 4Q 2025 to the level of 712 GWh/d. Exit means direction

RO->BG.

Bulgartransgaz EAD

2021

RO/TBP

BGg/BGT

570.0 GWh/d

Comment: Transmission via existing IP Negru-Voda with increase of capacity at level of 570

GWh/d, New capacity increment from 4Q 2023 to the level of 1140 GWh/d.

Bulgartransgaz EAD

2025

BGg/BGT

RO/TBP

712.0 GWh/d

Comment: Exit means direction RO->BG.

Bulgartransgaz EAD

2025

RO/TBP

BGg/BGT

570.0 GWh/d

Strandzha (BG) / Malkoclar (TR)

Bulgartransgaz EAD

2021

BGg/BGT

TRe

342.0 GWh/d

Comment: Transmission between Eastring - Bulgaria and Turkey via existing IP Malkoclar, New

capacity increment from 4Q 2023 to the level of 712 GWh/d. Exit means direction BG->TR.

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 50 of 620

Current TYNDP : TYNDP 2017 - Annex A