Table of Contents Table of Contents
Previous Page  98-99 / 1248 Next Page
Information
Show Menu
Previous Page 98-99 / 1248 Next Page
Page Background

Eastring Cross-Border BG/EAR>TR

Bulgartransgaz EAD

2025

BG/EAR

TRe

712.0 GWh/d

Comment: Exit means direction BG->TR.

Eastring Cross-Border TR>BG/EAR

Bulgartransgaz EAD

2021

TRr

BG/EAR

570.0 GWh/d

Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border,

New capacity increment from 4Q 2025 to the level of 1140 GWh/d.

Bulgartransgaz EAD

2025

TRr

BG/EAR

570.0 GWh/d

Capacity Increments Variant(s) For Information Only

Variant : Eastring - BG-1

High capacity scenario, starting at Negru-Voda IP at RO-BG border, passing through BG

using upgraded existing pipelines to Malkoclar IP at BG-TR border

Point

Operator

Year

From Gas System To Gas System Capacity

Eastring BG Domestic Point

Bulgartransgaz EAD

2021

BGn

BG/EAR

200.0 GWh/d

Comment: Connection of Eastring at Negru-Voda IP, with domestic market, Entry/Exit capacity

at domestic points may go up to the level of 200 GWh/d if sum of all Exit capacities from

domestic system to adjacent networks (or vice versa) is able to reach this level.

Bulgartransgaz EAD

2021

BG/EAR

BGn

200.0 GWh/d

Comment: Connection of Eastring at Negru-Voda IP, with domestic market, Entry/Exit capacity

at domestic points may go up to the level of 200 GWh/d if sum of all Exit capacities from

domestic system to adjacent networks (or vice versa) is able to reach this level.

Malkoclar (TR) > Strandzha (BG)

Bulgartransgaz EAD

2021

TRi

BGg/BGT

570.0 GWh/d

Comment: Transmission between Bulgaria and Turkey via existing transmission system at IP

Malkoclar, New capacity increment from 4Q 2025 to the level of 1140 GWh/d.

Bulgartransgaz EAD

2025

TRi

BGg/BGT

570.0 GWh/d

Negru Voda II, III (RO) / Kardam (BG)

Bulgartransgaz EAD

2021

BGg/BGT

RO/TBP

570.0 GWh/d

Comment: Transmission via existing IP Negru-Voda with increase of capacity at lewel of 570

GWh/d, New capacity increment from 4Q 2025 to the level of 1140 GWh/d.

Bulgartransgaz EAD

2021

RO/TBP

BGg/BGT

570.0 GWh/d

Comment: Transmission via existing IP Negru-Voda with increase of capacity at lewel of 570

GWh/d, New capacity increment from 4Q 2025 to the level of 1140 GWh/d.

Bulgartransgaz EAD

2025

BGg/BGT

RO/TBP

570.0 GWh/d

Bulgartransgaz EAD

2025

RO/TBP

BGg/BGT

570.0 GWh/d

Strandzha (BG) / Malkoclar (TR)

Bulgartransgaz EAD

2021

BGg/BGT

TRe

570.0 GWh/d

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 49 of 620

Current TYNDP : TYNDP 2017 - Annex A