Table of Contents Table of Contents
Previous Page  90-91 / 1248 Next Page
Information
Show Menu
Previous Page 90-91 / 1248 Next Page
Page Background

Expected Gas Sourcing

Caspian Region, Russia, LNG (), Southern gas corridor gas sources; European gas hubs; Black sea shelf gas; Domestic production;

Benefits

Main Driver

Others

PCI Details

PCI Benefits

General Criteria Fulfilled

Yes

Specific Criteria Fulfilled

Competition, Market Integration, Security of Supply, Sustainability

Specific Criteria Fulfilled Comments

Pipelines and Compressor Stations

Pipeline Section

Pipeline Comment

Diameter (mm) Length (km) Compressor Power (MW)

CS Strandja ² a new IP with Turkey.

Replacement of 20 km of gas pipelines (2x10km), DN 1000 in

the section CS Strandja ² a new IP with Turkey.

1,000

20

Looping CS Provadia ² Rupcha village

new looping and additional power to existing compressior

station

1,200

50

10

Total

70

10

Schedule

Start Date

End Date

Pre-Feasibility

Feasibility

FEED

Market Test

05/2017

Permitting

Supply Contracts

FID

Construction

06/2022

Commissioning

2022

2022

NDP and PCI Information

Part of NDP

Yes (2016-2025 Ten-year network

development plan of BTG)

NDP Number

Section 5.1. (5.1.1)

Currently PCI

Yes (6.25.4)

CBCA Decision

No

Market Survey

Not Relevant (no CBCA decision)

Third-Party Access Regime

Considered TPA Regime

Regulated

Considered Tariff Regime

Regulated

Applied for Exemption

No

Exemption Granted

No

Exemption in entry direction

0.00%

Exemption in exit direction

0.00%

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM

Page 45 of 620

Current TYNDP : TYNDP 2017 - Annex A