Eastring Cross-Border BG/EAR <> RO/EAR

Bulgartransgaz EAD

2025

RO/EAR

BG/EAR

570.0 GWh/d

Eastring Cross-Border BG/EAR>TR

Bulgartransgaz EAD

2021

BG/EAR

TRe

570.0 GWh/d

Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border,

New capacity increment from 4Q 2023 to the level of 1140 GWh/d.

Bulgartransgaz EAD

2025

BG/EAR

TRe

570.0 GWh/d

Eastring Cross-Border TR>BG/EAR

Bulgartransgaz EAD

2021

TRr

BG/EAR

570.0 GWh/d

Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border

New capacity increment from 4Q 2025 to the level of 1140 GWh/d.

Bulgartransgaz EAD

2025

TRr

BG/EAR

570.0 GWh/d

Capacity Increments Variant(s) For Information Only

Variant : Eastring - BG-4

Low capacity scenario (low in direction N->S), starting at new IP at RO-BG border, passing

through BG using new pipeline to new IP at BG-TR border

Point

Operator

Year

From Gas System To Gas System Capacity

Eastring BG Domestic Point

Bulgartransgaz EAD

2021

BGn

BG/EAR

200.0 GWh/d

Comment: Entry/Exit capacity at domestic points may go up to the level of 200GWh/d if sum of

all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this

level.

Bulgartransgaz EAD

2021

BG/EAR

BGn

200.0 GWh/d

Comment: Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of

all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this

level.

Eastring Cross-Border BG/EAR <> RO/EAR

Bulgartransgaz EAD

2021

BG/EAR

RO/EAR

342.0 GWh/d

Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of 712

GWh/d. Exit means direction RO->BG.

Bulgartransgaz EAD

2021

RO/EAR

BG/EAR

570.0 GWh/d

Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of

1140 GWh/d.

Bulgartransgaz EAD

2025

BG/EAR

RO/EAR

712.0 GWh/d

Bulgartransgaz EAD

2025

RO/EAR

BG/EAR

570.0 GWh/d

Eastring Cross-Border BG/EAR>TR

Bulgartransgaz EAD

2021

BG/EAR

TRe

342.0 GWh/d

Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border;

New capacity increment from 4Q 2023 to the level of 712 GWh/d. Exit means direction BG->TR.

Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM