Eastring Cross-Border BG/EAR <> RO/EAR
Bulgartransgaz EAD
2025
RO/EAR
BG/EAR
570.0 GWh/d
Eastring Cross-Border BG/EAR>TR
Bulgartransgaz EAD
2021
BG/EAR
TRe
570.0 GWh/d
Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border,
New capacity increment from 4Q 2023 to the level of 1140 GWh/d.
Bulgartransgaz EAD
2025
BG/EAR
TRe
570.0 GWh/d
Eastring Cross-Border TR>BG/EAR
Bulgartransgaz EAD
2021
TRr
BG/EAR
570.0 GWh/d
Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border
New capacity increment from 4Q 2025 to the level of 1140 GWh/d.
Bulgartransgaz EAD
2025
TRr
BG/EAR
570.0 GWh/d
Capacity Increments Variant(s) For Information Only
Variant : Eastring - BG-4
Low capacity scenario (low in direction N->S), starting at new IP at RO-BG border, passing
through BG using new pipeline to new IP at BG-TR border
Point
Operator
Year
From Gas System To Gas System Capacity
Eastring BG Domestic Point
Bulgartransgaz EAD
2021
BGn
BG/EAR
200.0 GWh/d
Comment: Entry/Exit capacity at domestic points may go up to the level of 200GWh/d if sum of
all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this
level.
Bulgartransgaz EAD
2021
BG/EAR
BGn
200.0 GWh/d
Comment: Entry/Exit capacity at domestic points may go up to the level of 200 GWh/d if sum of
all Exit capacities from domestic system to adjacent networks (or vice versa) is able to reach this
level.
Eastring Cross-Border BG/EAR <> RO/EAR
Bulgartransgaz EAD
2021
BG/EAR
RO/EAR
342.0 GWh/d
Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of 712
GWh/d. Exit means direction RO->BG.
Bulgartransgaz EAD
2021
RO/EAR
BG/EAR
570.0 GWh/d
Comment: New interconnection point, New capacity increment from 4Q 2025 to the level of
1140 GWh/d.
Bulgartransgaz EAD
2025
BG/EAR
RO/EAR
712.0 GWh/d
Bulgartransgaz EAD
2025
RO/EAR
BG/EAR
570.0 GWh/d
Eastring Cross-Border BG/EAR>TR
Bulgartransgaz EAD
2021
BG/EAR
TRe
342.0 GWh/d
Comment: Transmission between Eastring - Bulgaria and Turkey via a new IP at BG/TR border;
New capacity increment from 4Q 2023 to the level of 712 GWh/d. Exit means direction BG->TR.
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 48 of 620
Current TYNDP : TYNDP 2017 - Annex A