Immingham Storage Co Ltd – Immingham East Terminal - No4 Switchroom Tank Overfill Safety Instrument System
Logic Panel Factory Acceptance Test Procedure
P & I Design Ltd
DOCUMENT NO: SI483005_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: A DATE: 05.03.13
Tel: + 44 (0)1642 617444
PAGE 4 OF 19
Fax: + 44 (0)1642 616447
www.pidesign.co.uk2.0
DOCUMENTATION VERIFICATION
Purpose of Test
Verify Correct Documentation used for testing.
Method of Test
Confirm documentation and revisions used for testing.
Record permit number and type (cold/hot/confined space)
Permit To Work Number
Permit To
Work Type
Safety Instrument System Documentation Manual SI483001_MNL Revision
Drawing Number
Title
Revision
SI483005_DWG
SIS Logic Panel External Layout
SI483006_DWG
SIS Logic Panel Internal Layout
SI483007_DWG
SIS Logic Drawing 1 , Power Distribution
SI483008_DWG
SIS Logic Drawing 2 , ESD
SI483009_DWG
SIS Logic Drawing 3 , Tank 561
SI483010_DWG
SIS Logic Drawing 4 , Tank 564
SI483011_DWG
SIS Logic Drawing 5 , Tank 568
Schedules
Title
Revision
SI483003_SCH
No.4 East 500 Series Tanks Safety Functions Matrix
SI483008_SCH
No.5 SIS Logic Panel Label Schedule
Instrument Specifications
Title
Revision
SI277001_SPC
Tank Level Switch (Liquiphant)
Reports
Title
Revision
SI483002_RPT
500 Series Tank Farm Safety Requirement Specification
SI483003_RPT
500 Series Tank Farm Management of Functional Safety
SI483004_RPT
500 Series Safety Instrument System
Actions/Comments
Sign
Date
Tested by