Immingham Storage Co Ltd – Immingham East Terminal - No4 Switchroom Tank Overfill Safety Instrument System
Logic Panel Factory Acceptance Test Procedure
P & I Design Ltd
DOCUMENT NO: SI483005_RPT
2 Reed Street, Thornaby, UK, TS17 7AF
ISSUE: A DATE: 05.03.13
Tel: + 44 (0)1642 617444
PAGE 5 OF 19
Fax: + 44 (0)1642 616447
www.pidesign.co.uk3.0
INSPECTION
3.1
EQUIPMENT CONFORMS TO INSTRUMENT SPECIFICATIONS
Equipment Required
Hand Tools, yellow highlighter, red pen
Purpose of Test
To verify the fitted equipment is as specified.
To verify the fitted equipment is set up as specified.
Method Of Test
Result/Date
3.1.1
Controlled copies of listed specifications will be used to record, by
highlighting (yellow), correct equipment is installed as per Tag number listed on
specification. Errors and omissions will be corrected and noted in red.
Record serial numbers of equipment on controlled copy specifications .
Switches and dials to be adjusted to correct settings as detailed on drawings,
verify set correctly by highlighting (yellow) on controlled copy drawings.
1.
SI277001_SPC - Tank Level Switch (Liquiphant)
Actions/Comments
Sign
Date
Tested by