Immingham Storage Co Ltd – Immingham East Terminal - No4 Switchroom Tank Overfill Safety Instrument System

Logic Panel Factory Acceptance Test Procedure

P & I Design Ltd

DOCUMENT NO: SI483005_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 05.03.13

Tel: + 44 (0)1642 617444

PAGE 6 OF 19

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

3.2

LOGIC PANEL CONSTRUCTION INSPECTION

Equipment Required

Hand Tools, yellow highlighter, red pen.

Purpose of Test

To verify the logic panel construction is satisfactory to proceed to powered functional testing

.

The logic

panel has been constructed and wired by a competent & reputable panel building company; initial quality

checks have been carried out prior to being available for witnessed factory testing.

Method Of Test

Result/Date

3.2.1

Controlled copies of listed logic drawings will be used to record, by

highlighting (yellow), satisfactory terminations and functions. Errors and

omissions will be corrected and noted in red.

1.

External panel layout and identification conforms to SI483005_DWG and

SI483008_SCH.

2.

Internal panel layout and identification conforms to SI483006_DWG.

3.

Panel physical construction and paintwork satisfactory.

4.

Gland plates correctly fitted and satisfactory.

5.

Doors and locks operational.

6.

Equipment mountings secure.

7.

Panel earthing correct.

8.

All equipment voltage rating correct and conforms to specifications.