Immingham Storage Co Ltd – Immingham East Terminal - No4 Switchroom Tank Overfill Safety Instrument System

Logic Panel Factory Acceptance Test Procedure

P & I Design Ltd

DOCUMENT NO: SI483005_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 05.03.13

Tel: + 44 (0)1642 617444

PAGE 8 OF 19

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

4

FUNCTIONAL TESTING

4.1

PANEL INFRASTRUCTURE

Equipment Required

Multi-meter, hand tools, yellow highlighter, red pen.

Purpose of Test

To verify the functionality of the panel infrastructure.

Method Of Test

Result

1.

Initial setup, all MCB’s to the off position, all 24Vdc, 0Vdc fuses and links

removed. Connect a suitably protected 240Vac supply to the panel isolator

incoming terminals.

2.

Select internal isolator to off position, establish ac power to logic panel.

Confirm no Vac at MCB’s, select internal isolator to on position, confirm

and record 240 Vac power on all MCB’s.

ISO On …………..Vac

ISO Off ………….Vac

3.

Confirm and record 24Vdc on all TB24V terminals to associated TB0V

terminal when MCB 1 on, confirm 0Vdc on all TB24V terminals to

associated TB0V terminal when MCB 1 off.

MCB On ………...Vdc

MCB Off ………...Vdc

4.

Confirm socket energised when MCB 2 on, confirm de-energised when

MCB 2 off..

5.

Confirm panel internal light illuminated when MCB 3 on, confirm

extinguished when MCB 3 off.

6.

Confirm power on load side of MCB 4 when MCB 4 on, confirm no power

on load side when MCB 4 off.

MCB On ………...Vac

MCB Off ………...Vac

7.

Confirm power on load side of MCB 5 when MCB 5 on, confirm no power

on load side when MCB 5 off.

MCB On ………...Vac

MCB Off ………...Vac

8.

Insert each 24Vdc fuse and 0Vdc link in turn confirming 24Vdc across

load side and associated panel equipment powers up where applicable.

Actions/Comments

Sign

Date

Tested by