Immingham Storage Co Ltd – Immingham East Terminal - No4 Switchroom Tank Overfill Safety Instrument System

Logic Panel Factory Acceptance Test Procedure

P & I Design Ltd

DOCUMENT NO: SI483005_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 05.03.13

Tel: + 44 (0)1642 617444

PAGE 7 OF 19

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

3.3

LOGIC PANEL WIRING INSPECTION

Equipment Required

Hand Tools, yellow highlighter, red pen.

Purpose of Test

To verify the logic panel internal wiring is satisfactory to proceed to powered functional testing. The logic

panel has been constructed and wired by a competent & reputable panel building company; initial quality

checks have been carried out prior to being available for witnessed factory testing.

Method Of Test

Result

3.3.1

A random sample of the following tests to be carried out. During the

procedure of functional testing the controlled copies of listed logic drawings will

be used to record, by highlighting (yellow), satisfactory compliance with actions

1 to 6. On completion of all functional testing, all logic drawings should be fully

highlighted. Errors and omissions will be corrected and noted in red.

1.

Terminals type and numbering conforms to logic drawings.

2.

Panel wire feruling conforms to logic drawings.

3.

Panel wire gauge and colour conforms to panel specification.

4.

Fuse and MCB ratings conform to logic drawings.

5.

Termination and crimps tight.

6.

Point to point wiring correct to logic drawings.

Actions/Comments

Sign

Date