Supporting renewable energy

The acquisition of the offshore activities of VolkerWessels in

2016 is consistent with our increased level of activity in the field

of renewable energy. The acquired activities consist of VBMS,

in which Boskalis already held a 50% stake, Stemat and Volker

Stevin International (VSI). VBMS is the European market leader in

offshore cable installation and VSI specializes in the installation of

offshore foundations and maritime structures.

In 2016 we installed 138 foundations and laid 420 kilometers

of cables. We executed and were awarded the following

projects in 2016:

‚

‚

Transport and installation of the DolWin 3 platform.

‚

‚

Construction of the Wikinger and Veja Mate offshore wind

farms. Strict environmental requirements were successfully met

on both projects. For more information on these projects and the

stringent noise mitigation measures taken, please refer to our

online magazine

(boskalis.com/magazine

).

‚

‚

Installation of the first 45 kilometer-long export cable for the

Galloper offshore wind farm. The wind farm, which will consist

of 56 wind turbines, is located about 27 kilometers off the coast

of Suffolk, United Kingdom. In 2017, our subsidiary VBMS will

install the second export cable as well as 56 inter-array cables

for the Galloper offshore wind farm.

‚

‚

Installation of 142 kilometer-long export and inter-array cables

for the Dudgeon offshore wind farm. The wind farm is located

32 kilometres off the coast North of the town of Cromer in North

Norfolk, UK and 20 kilometres to the north east of the Sheringham

Shoal OWF and consists of 67 wind turbines with a total capacity

of approximately 400 MW.

‚

‚

Installation of 100 kilometer-long inter-array cables for the Sandbank

offshore wind farm. The Sandbank Offshore Wind Farm is located

in the German Bight, next to the DanTysk OWF and consists of

72 wind turbines with a total capacity of approximately 288 MW.

‚

‚

In addition, several smaller cable installation projects were

executed.

‚

‚

In July Boskalis was awarded the Aberdeen offshore wind farm,

an Offshore Balance of Plant contract by Vattenfall. The use of

suction bucket jacket foundations in conjunction with the large

wind turbines and the use of high-capacity 66kV power cables

make this project unique. The execution is scheduled to

commence in September 2017

‚

‚

In October Boskalis was awarded a contract by DONG Energy

Wind Power A/S for the transport and installation of the jacket

foundations for part of the Hornsea Project One offshore wind

farm. Located approximately 120 kilometers off the coast of

Yorkshire, UK, the entire wind farm will have a total capacity of

1,200 MW. The transport and installation of the foundations will

be executed by Boskalis’ new offshore transport and installation

crane vessel, for which an existing F-class heavy transport vessel

is currently being converted. The vessel will be equipped with a

3,000-ton mast crane, dynamic positioning (DP2) and additional

accommodation for up to 150 people.

‚

‚

In November Boskalis was awarded the Borssele Alpha contract

by TenneT for the installation of two 61-kilometer export cables

that will connect the Borssele offshore wind farms 1 and 2 to

TenneT’s onshore grid in the Netherlands. Separately, the option

was awarded for the installation of the export cables that will

connect the Borssele offshore wind farms 3 and 4 to the Dutch

onshore grid (Borssele Beta), subject to financial close.

‚

‚

In addition, numerous cable installation projects were awarded.